Making a stock count of merchandise for the event of the day, which is Bittersweet: A Perfect Rematch.
Painting flower pots to decorate Cafe Sua.
Posting countdown content and Alt Shift: My Chemical Romance event venue.
Doing operational work for Cafe Sua by installing Free Palestine banting and new cabinets.
Make content posting countdown days and do & donts.
Making decorations in our office for the Atas Angin Raya banquet.
The result after we set up all our decorations for this Raya banquet.
Came to the office for our work briefing today.
Preparing our work tools for Cafe Zona's repair work today.
Digging a hole to install this Cafe Zona banner.
Move to the flower shop to buy it as decoration.
After we bought it we moved back to Cafe Zona to prepare to decorate it.
After matching the flowers and vase, we choose the right place to place them.
We also leveled the ground with tar for tidiness along the Cafe Zona road.
The result after all our work is done.
Be the stage crew for Alt Shift: My Chemical Romance cover show.
I need to be a runner for technical items and take care of them so that they don't get damaged.
We were sent to be the ushers for the GenKRU Day 1 concert.
We need to memorize the seating number at Axiata Arena to make it easier for us to point the direction of the seats of the crowd on this day.
The situation before the start of the GenKRU Day 1 concert and where I was assigned was in section 303.
Usher briefing for Day 2.
The situation before the audience entered the Axiata Arena hall.