Milestones were created to keep the project on schedule. To create a tangible way of staying on track, deliverables were made and scheduled at the beginning of the semester. The following links document the progression of the project through the deliverables completed every week.

Semester 2 Deliverables

Week 2   Initial Parts Order 

Week 4   Valve Testing Procedure

     Proportional Valve Memo

          Solenoid Valve Memo 

Week 6 -    Updated Proportional Valve Testing Procedure

     Updated Proportional Valve Testing Memo 

Week 7 -    PVC Arm AutoCAD Drawings 

Week 8 -    Constructed Pipe Body 

Week 9 -     Schematic

Week 10 GPS Code Development 

          GPS Testing Procedure 

          GPS Testing Memo 

                   Video of GPS Running 

Week 12 Demonstration Code 

                    Updated Schematic 

                    Wiring Pictures 

Week 13 -  Initial Arm Testing Procedure 

            Nozzle Testing Memo 

Week 14  - Edited Final Video 

                   Final Video (Raw) 

  Demonstration Code (Doc) 

  GitHub Link  

  Final Testing Memo 

Week 15 - Poster Presentation 

Week 16 - Design Package 

Week 17 - Design Report 

Semester II Deliverable/Milestone Schedule

Water Truck Arm Deliverables Spring.pdf