Milestones

Semester I Milestones

Milestones were created to keep the project on schedule. To create a tangible way of staying on track, deliverables were made and scheduled at the beginning of the semester. The following links document the progression of the project through the deliverables completed every week.

Semester 1 Deliverables

Week 6 -     Finalize Idea for Design

Week 7 -     List of Proposed needed Parts 

Week 8 -     Rough Sketch 

Week 9 -     Calculations on Nozzle Spacing and Flowrate

Week 10 -   Second Sketch with Labeled Parts

                    Bill of Materials 

Week 11 -   Wire Schematic and Code Flow Chart 

Week 12 -   AutoCAD 

Week 13 -   Design Poster 

Week 15 -   2D Drawings of All Parts 

Week 16 -   Design Package 


Deliverable/Milestone Schedule

Water Truck Arm Deliverables Fall.pdf