Walden Public School is proud to partner with local business CRCS Recreation to design and install our playground. Equipment will be purchased from Miracle Recreation. We have divided the project into multiple stages in order to break ground as soon as possible. As we continue to fundraise, we hope to achieve all stages of the project. Depending on fundraising success, phases 2 and 3 may be completed in reverse order.
This phase of the project is anticipated to be installed in summer 2025. Phase 1 includes an overhead climber structure and a play structure with slide. Total cost is estimated at $78,000.
This phase of the project will be purchased and installed depending on fundraising outcomes. Phase 2 includes a taller play structure with large twirly slide and shaded roof feature. The anticipated cost is $151,000.
This smaller project could be done concurrently with either Phase 1 or Phase 2. It includes two smaller play components including a spinner and a STEM sensory panel. The anticipated costs are $30,000.