Project Overview
Project Overview
Current trash collection sites in Lexington funded and controlled by LFUCG.
Lake Ellerslie, downstream of Squire Road experiences lots of plastic pollution in stream that contaminates the Jacobson Reservoir #4.
Current prototype installed at the culvert in the reservoir with minimal trash collection and flow.
New design to be created to improve the trash collection at this site with notes taken from previous designs.