Site before restoration
Site before restoration
Water has seeped into the ground and shows up in the newly constructed tank after the first rains of the season
Rain water has flowed through the pipe and collected in the pits
Cleaning the structure
Bush clearance around the nala
Photogrammetry documentation
Segregating stones
Removal of cement stone mixture
Resetting top layer stones using crane
Resetting top layer stones using crane
Ballies were collected and shifted from stepwell and utilised of construction of rain shed, construction
Preparation of lime, jaggery syrup
Preparation of lime, jaggery syrup
Site re-levelling
Step re-setting
Floor re-setting
Stone surface cleaning
Stone surface cleaning
Pavement base setting
Pointing work
Pointing work
Pointing work
Pointing work