Date: 4 June 2023, Saturday
Activate 10 ⅙ access card
Change new spotlight at Signboard
Reconnect VMS at new tablet that Mr Sharif purchased for the security team>
but cant connect it. Need to ask IResidez team to get pass word etc. and assist to get it working.
Date: 3 June 2023, Friday
Activate 10 ⅙ and 25 ⅓ access card
Change spotlights at residence entry, residence exit and backlane ½ to 1/3
Date: 2 June 2023, Thursday
Owner complaint on meter running fast at 6 ⅓
Visit Abedeen Clubhouse for AGM and check the venue
Change new spotlight at backlane ¼ to ⅕, near playground and near clocking point 25]
Observed Air Selangor changing new pipeline at 2 ⅓ and for water leaking underground beside security room.
Spotlight fall down at near camera 25 and near TNB building and needs to be fixed.
Date: 1 June 2023, Wednesday
Check the plumber job at 2 ⅓, the outcome is the water still slow and this issue being informed to Air Selangor
Change new spotlight near camera 19, end of road ⅓
Check new tablet
AGM preparation at Garden Plaza Hall
Date: 31 May 2023, Tuesday
Change new spotlight near camera 6 and camera 8
Change new timer near camera 12 and camera 7
Date: 28 May 2023, Saturday
1. Check common area cleanliness, still have rubbish at 1 1/3 common area
2. Owner complain on leaves fall down at their property 2 1/3
3. Request to cut the tree branches at 2 1/3 because monkey use it to enter owner house
4. Over grown grass at 7 1/1
5. Check pipe leaking at 1/2 common area.
Date: 27 May 2023, Friday
1. Recheck pipe meter for cassia water meter
2. Water meter running very fast, checking on underground leaking.
3. Activate 32A 1/3 access card
4. Check all pipe leaking at common area.
5. Observe Wall paint contractor.\
Date: 26 May 2023, Thursday
1. Change New 9 PU flexible pole at visitor and residence entry
2. Change new 1 PU flexible pole at 1/1 roundabout
3. Over grown grass at 3 1/1
4. Check on water pressure at security and MO toilet
5. Check on Major renovation at q6 1/5, 46 1/5, 52 1/4 43 1/2 and 38 1/3
6. Main water meter running very fast at cassia water meter
Date: 25 May 2023, Wednesday
1. Check cctv at the barrier gate
2. Check PU flexible pole at mo office
3. Inspection pipe at ⅕ common area
4. Collect wall crack picture at cassia wall
Date: 20 May 2023, Friday
1. RCCD switch falls down near security office
2. Setting the timer for spotlight at ⅕ and ⅙ backlane
3. Aircond needs service
4. changed new pipeline at ¼ common area
5. Informed owner regarding clearing rubbish issue
Date: 19 May 2023, Thursday
Overgrown grass at 38 ½ , 53 ⅓, 42 ⅓, 1 ¼, 53 ¼, 50 ¼, 31 ⅕, 46 ⅕
2. Camera fall down at ⅓ street
3. Activate 32 ½ access card
4. Teaching the security on how to use the rat trap
Date: 18 May 2023, Wednesday
1. Wash 7 PU flexible pole beside security room
2. Change 6 new PU flexible pole at residence exit
3. Change 1 new PU flexible pole residence in
4. Inspect pipe leaking with Mr Yeo at ⅕ and 1/4 common area
5. Filing Daily Collection receipt
Date: 17 May 2022, Tuesday
1. Camera faulty because of heavy storm ( Camera 30, 29, 28, 27, 22, 21, 19, 1-2, 1-4, 1-5)
2. RCCD fall down near playground
3. Check all streetlights and spotlights
4. Meeting with MR Jude and Mr Shariff
5. Inspect pipe leaking at ⅕ common area with Mr Zaini (the plumber)
Date: 14 May 2023, Saturday
1. Activate Access card for 10 ⅙
2. Pipe leaking at ⅙ common area, road should be break to handle the problem
3. Filing Daily Collection Receipt
Date: 13 May 2023, Friday
1. Check all streetlights and spotlights
2. Damage street light at SL 039
3. Damage more than 10 Spotlights
4. Activate 10 ⅙ and 30 ⅓ Access card
5. Complaints regarding rubbish not clear at 1 ⅓, make a spotcheck on it.
Date: 11 May 2023, Wednesday
1. Setting the TV CCTV at Security Room
2. Setting CCTV at security room
3. Spotlight damaged at cassia signboard
4. Remove raya decorations at cassia signboard, roundabout and entrence
Date: 14 April 2023, Thursday
1. Checking the aircond for service at security room
2. Cement crack at 43, ½ common area
3. Pipe leaking at 39, ½
4. Remove the wire at DB cam 25
5. Install new raya decoration
Date: 13 April 2023, Wednesday
1. RCCD switch fall down beside security office
2. Decoration light fall down
3. Checking all spotlight
4. Buying technical supply with Mr Shariff
5. Install new raya decorations
Date: 12 April 2023, Tuesday
1. Checking access card
2. Check the pipe at common area
3. Buying food for cat and rat trap
4. Aircond at Management Office service
5. Setting rat trap at 43, ¼
Date: 11 April 2023, Monday
1. Checking on low water pressure at 1, ⅕
2. Activate 32A ¼ access card
3. Checking all street and spotlight
4. Filing daily collection recipt
Date: 10 April 2023, Sunday
1. Buying technical supply fie playground and cassia signboard
2. Testing cable and light at the entrance, roundabout and cassia signboard
Date: 09 April 2022, Saturday
1. Checking Raya decorations
2. Change clocking point no 9 place
3. Filing Daily Collection receipt
Date: 08 April 2023, Friday
1. Set the timer for street light and spotlight near TNB Building
2. Checking all spotlight and streetlight
3. Connect all decorations light on top f security building
4. RCCD switch fall down beside security office
5. Failing Daily Collection Receipt
Date: 07 April 2023,Thursday
1. Activate 35, ¼ Access card.
2. Helping the car break down near MO Office
3. Check on the grow grass around cassia
4. Failing Daily Collection Receipt
Date: 06 April 2023, Wednesday
1. Checking house renovation that are on progress
● 46, ⅕
● 52, ¼
● 43, ½
2. Follow fogging procedure around cassia resident
3. Failing Daily Collection Receipt
Date: 05 April 2023, Tuesday
1. RCCD switch fall down beside security room
2. Camera at 1/3 street super link fall down
3. Setting PC for camera at security room
4. Inspection with Mr Shariff around cassia
5. Changing the clocking place at end of 1/6 road
Date: 04 April 2023, Monday
1. Checking all Spotlights and street lights
2. MCB fall down near camera 20
3. Light near camera 19 damaged
4. Owner complaint some one throw rubbish at 12, ⅓
5. Clean MO Office
Date: 25 March 2023, Friday
1. Check access card for 36, ¼
2. Double tape the barrier gate switch
3. Wash playground stone and wall
4. Black out at the security office and MO office
5. Pipe problem at 39, ½
Date: 24 March 2023, Thursday
1. Check all light
2. 5 spotlight to be changed around Cassia
3. Spotlight adjustment due to heavy rain and air
4. Change new pipe tap at ¼ common area
5. Check the e-bike charging wire
Date:23 March 2023,Wednesday
1. RCCD fall down at the security office
2. Give power supply for 25 camera DB box at playground
3. Wash the playground stone
Date: 22 March 2023, Tuesday
1. Search pipe leaking around cassia
2. Inspection with the landscape supervisor at ¼ back lane
3. Pipe leaking at ⅙
4. Wash the playground stone
Date: 21 March 2023, Monday
1. Checking on spotlight timer for 1/3 and 1/6 backlane
2. Camera on 1/3 street super link fall down
3. Setting timer near TNB building
4. Washing 1, 1/1 common area with Mr Shariif
Date: 19 March 2023, Saturday
1. Continue installing the spotlight at 1/5 and ⅙
2. Setting spotlight timer from 7pm to 7am
Date: 18 March 2023, Friday
1. Measurement are taken to install new clocking point
2. Change clocking point no 19,20 1nd 25
3. Install 2 new spotlight at 1/5 and ⅙
Date: 17 March 2023, Thursday
1. Inspection with Mr Sharif
2. Buying new technical supply for spotlight, wire and timer
3. Change the clocking point place at PL 017
4. Checking the back lane DB box camera 15 to install 2 new spotlight at 1/5 and ⅙
Date: 16 March 2023, Wednesday
1. Repair bench seat at 1/6 and 1/5 common area
2. Checking all street light and spotlight
3. Changing 5 spotlight to be changed
Date: 15 March 2022, Tuesday
1. Spotlight fall down at the roundabout
2. Failing Daily Collection receipt
3. Inspection with Mr Shariff
Date: 14 March 2022, Monday
1. Checking all streetlight and spotlight
2. Install 3 new spotlight at the entrance
3. Received complaint from 39, ½ owner regarding the rat issue
4. Setting 2 rat trap at 39, ½
Date: 12 March 2022, Saturday
1. Buy poly pipe
2. Inspection with Mr Shariff
3. Changing new poly pipe at ¼ common area estimated length is 10 meter.
Date: 11 March 2022, Friday
1. Pipe leaking at ¼ common area
2. Checking pipe leaking at 6, 1/4
3. Inspection with Mr Shariff
4. Keep the cat trap cage on top of security building
5. Checking wire for tomorrow job
Date: 10 March 2022, Thursday
1. Buy technical supply
2. Changing new elbow and tap
3. Changing new light at pole light 018
4. Spotlight damage beside security room
5. Make a new list of spotlight to install new spotlight
6. Failing Daily Collection receipt
Date: 09 March 2022, Wednesday
1. Checking all streetlight and spotlight
2. MCB switch fall down near camera 20
3. MCB switch fall down at end of ¼ road
4. RCCD switch fall down beside security room
5. Failing Daily collections receipt
Date: 08 March 2022, Tuesday
1. Failing Daily Collection Receipt
2. Inspection with Mr Shariff
3. Remove rat and cat trap
● 1/3 to ¼ backlane
● 20, ½
● 20, ⅓
Date: 07 March 2022, Monday
1. Complaint by 45, ½ owner regarding the renovation dust.
2. Checking all spotlights and streetlights
3. Failing Daily Collection Receipt
Date: 05 March 2022, Saturday
1. Checking all the spotlights and streetlights around cassia resident
2. Inspection around Cassia Resident with Mr Shariff
Date: 04 March 2022, Friday
1. Inspection around Cassia Resident with Mr Shariff
2. Reset and checking PC at security office with Mr Shariff
3. Cut of the power supply for decoration supply on top of security building
4. Camera 12 charger adapter disconnected
5. Failing Daily Collection Receipt
Date: 03 March 2022, Thursday
1. Check PC at Security Office
2. Check all spotlight around Cassia Residents
3. Check all streetlight around Cassia Residents
4. Activate 11, 1/1 Resident Card
5. Failing Daily Collection Receipt
Date: 02 March 2022, Wednesday
1. PC system break down at the security room
2. Inspection by Zaini about the plumbing works at 45, ½
3. Failing Daily Collections Receipt
Date : 1 March 2022, Tuesday
1. Inspection with Mr Shariff at Unit:
● 20, ½
● 45, ½
● 52A, ⅓
● Around Cassia Resident
2. Zaini the plumber put sand at unit no 45, ½
3. Failing Daily Collections Receipt
Date: 28 February 2022, Monday
1. RCD switch fall down near camera 26 DB
2. System break down at security office
3. Failing Daily Collection receipt
Date: 27 February 2022, Sunday
1. Black out at security office
2. Janitor automatically on because no main supply
3. RCCD switch fall down beside security room and perimeter camera DB
Date: 26 February 2022, Saturday
1. Failing Daily Collection Receipt
Date: 25 February 2022, Friday
1. Clocking point damage at point 23
2. Change clocking point because protective flouring plants at point 24
3. Spotlight damage top side of security building
4. Checking back lane leaking from house at ½
5. Filing Office Receipt
Date: 24 February 2022, Thursday
1. Pole light PL018 light damage again
2. LED downlight damage at Mo Office
3. Clear filing paper
4. Plumber doing their job at 20, ½
5. Camera fall down at 1/3 roundabout
Date: 23 February 2022, Wednesday
1. Install 2 new spotlight at end of walkway, near camera 14
2. Complaint by 52A, 1/3 and 20, ½ owner on pipe leaking
3. Remove CNY decorations
4. RCCD switch fall down at the security office
5. 3 spotlight damaged on top of security building
Date: 22 February 2022, Tuesday
1. Checking all streetlight and spotlights
2. Spotlight damage near camera 19, camera 18 and camera 6
3. PVC pipe fall down at the playground
4. Follow the plumber at 20, ½
5. Install new spotlight at 1/5 and 1/6 because the place are very dark at night
Date: 21 February 2022, Monday
1. Checking on the plumber pipe leaking works at 45, ½
2. Remove CNY decorations around cassia
Date: 03 February 2022, Thursday
1. Loop detector damage at the barrier gate of the resident exit
2. Changing new T8 LED light at the security office
3. Take photo of the house which have grow grass
● 3, 1/1
● 7, 1/1
● 11, 1/1
● 26, ½
● 43, ½
● 38, ⅓
● 53, ⅓
● 1,¼
● 47, ¼
● 53, ¼
● 31, ⅕
4. Do check list for maintenance tools
Date: 31 January 2022, Monday
1. Clean the water filter at the management office
2. Check the grass at 1/6 common area
3. Set the cat food for the trap at 20 ½, 20 1/3, ¼ and 1/5 backlane
4. Checking the grass grow around cassia with Mr Shariff
5. Check grow grass at 50, ¼
6. Check the rubbish 35, ¼
Date: 29 January 2022, Saturday
1. CCTV Perimeter RCD fall down near camera 3
2. RCD fall down beside security office
3. Change plan on CNY decorations
4. Follow new CCTV guy to inspect the CCTV around Cassia
5. Set cat trap at 20, ½
Date: 28 January 2022, Friday
1. Remove the red sticker at all pole lights
2. Screw the number tagging at street light
3. MCB fall down walkway near camera 8
4. Over grow grass at 1/6 common area
5. Security system break down
Date: 27 January 2022, Thursday
1. Complaint by 20, ½ owner the leaves fall in the house area
2. Checking grow grass around the cassia
3. Checking spotlight MCB fall down at end of road 1/3 and near camera 20
Date: 26 January 2022, Wednesday
1. Follow crane at 46, ⅕
2. Tree fall down at playground
3. Replace admin places
4. Checking all DB box
5. RCD fall down near security office
Date: 25 January 2022, Tuesday
1. Function box damage near camera 7
2. Pipe leaking common area 1/3 and ⅙
3. Screw the light numbering at street light and pole light
4. Checking DB trip at security room
Date: 24 January 2022, Monday
1. Grass complaint by 29, ½ ad 31, ½ owner
2. Clean up the janitor room
3. Checking camera power supply
4. Checking all street lights and spotlights
5. Pipe tap changing at security room
Date: 22 January 2022, Saturday
1. Checking on camera 23, 24 and 31, reported that camera 23 and 24 there is no power supply and camera 31 damaged.
2. Checking on camera 25, DB protective
Date: 21 January 2022, Friday
1. Setting cat trap at 20, ⅓
2. Installing Chinese New Year decorations
3. Follow CCTV new contacted for camera 1 and camera 2
4. Checking on camera and supply
Date: 20 January 2022, Thursday
1. Install Chinese New Year Decorations
2. Remove damaged light from the decorations
3. Bring the lawn mower to show the house
4. Guide the plumber on toilet clogged issue at security room
Date: 19 January 2022, Wednesday
1. Install Chinese new year decorations at the entrance
2. Change the street light at 29, ¼
3. Change 2 spotlight at the playground
Date: 17 January 2022, Monday
1. Checking pipe at 1/3, ¼, 1/5, 1/6 common area
2. Buy piping supply
3. Settling all the piping job
4. Rechecking pipe again
Date: 15 January 2022, Saturday
1. Check damage timer near camera 12
2. Setting timer at the security office
3. Prepare decoration for chinese new year
Date: 14 January 2022, Friday
1. Checking leaking pipe at 43, 1/3 common area
2. Buying pipe and technical pipe
3. Do plumbing 43, ⅓
4. Throw the trash in the truck
5. Set timer near camera 12 walkway area
Date: 12 January 2022, Wednesday
1. Repair Office table
2. Checking on emergency pipe
3. Check and prepare chinese new year decorations
4. Checking wire for chinese new year decorations
Date: 11 January 2022, Tuesday
1. Set cat trap at 20, ⅓
2. Manage the numbering installation at the cassia pole light and street lights
Date: 10 January 2022, Monday
1. Common area crash at 43, ½
2. MCB closed at ¼ and 1/5 middle hallway behind house at end of road
3. Install new file rack
4. Checking over grow grass around Cassia
Date: 08 January 2022, Saturday
1. Write reports from early December to end of January
2. Find the cat trap at cassia
Date: 07 January 2022, Friday
1. Checking the chinese new year decorations and update it to Mr Darren.
2. Catch kitten at 51, ¼ rooftop
3. Set timer for entrance wall cassia signboard
4. Order technical supply
5. Meeting
Date: 06 January 2022, Thursday
1. Remove old pipe and cable at end of ¼ road
2. Checking the cable to be used.
3. Add new light and cable at ¼ and 1/5 middle hallway behind the house end of road
4. Remove Christmas decorations
5. Keep the decorations at the janitor room
6. Rearrange the light at the cassia signboard
Date: 05 January 2022, Wednesday
1. Lights at end of ¼ road did not have any power supply.
2. Checking cable at end of ¼ road
3. Add 1 junction box at end of ¼ road
4. Place cable inside in PVC Pipe end of ¼ road
5. Give power supply from TNB to street light at end of ¼ road
6. Follow the TNB Street light time from 7pm to 7am at end of ¼ road
Date: 03 January 2022,Monday
1. Checking wire and light, damage light have been changed
2. Checking and changing the damage cable.
3. Light turn down
4. Pipe fall down at 2 places
Date: 31 December 2021, Friday
1. Check light and cable at end of ¼ and 1/3 road
2. Change new light at walk side
Date: 29 December 2021, Wednesday
1. Checking the edge light and cable
2. Search cable edge
Date: 28 December 2021, Tuesday
1. PVC pipe fall down near tab room
2. Light fall down near tab room
3. The camera pole is tilted at tab room
4. Change timer near TNB Room DB
5. Set the rat trap behind resident house
6. Checking all the pole lights and DB box around Cassia
Date: 27 December 2021, Monday
1. Put back electric plug point 13A Socket security room
2. Add new 13A socket electric waterproof
3. Change 2 switch light
4. Install new light
5. Light fall down near camera 24
Date: 24 December 2021,Friday
1. Change the new decoration light at tree
2. Spotlight fall down
3. Setting the timer
4. Testing the pole light at the playground
5. Add new decorations light
Date: 23 December 2021, Thursday
1. Settling the cable planting at playground
2. Power supply for light and doing test
Date: 22 December 2021, Wednesday
1. Process to plant cable at the playground (Digging the soil and place the cable, the sand layered in every steps, cement on top of the sand)
Date: 21 December 2021, Tuesday
1. Digging the ground at the playground for planting cable.
Date: 20 December 2021, Monday
1. Ground digging at the playground to place 30 meter wire
Date: 18 December 2021, Saturday
1. Setting Christmas light decorations
2. Installing the decorations at cassia roundabout
Date: 17 December 2021, Friday
1. Clean up management office
2. Install Christmas decorations
3. Install new light and extend Lead 4 in 1
Date: 16 December 2021, Thursday
1. Spotlight fall down at 1/3 end of road
2. Change new spotlight at ½ end of road
3. Install new decorations light at casssia entrance and roundabout
Date: 15 December 2021, Wednesday
1. Give power supply for light
2. Doing new wiring
3. Use new RCD and timer
4. Light fall down over the wall entrance and security office
Date: 14 December 2021, Tuesday
1. Change Christmas Decoration
2. Change the new spotlight near TNB Room
3. Light fall down behind TNB room
4. Plant the cable and change new spotlight
Date: 13 December 2021, Monday
1. Install Christmas Decorations
Date: 10 December 2021, Friday
1. Go buy supplies for playground and signboard
2. Testing cable and light for wall entrance, roundabout and signboard
Date: 09 December 2021
1. Checking cable and light at entrance wall and roundabout cassia signboard.
Date: 08 December 2021, Wednesday
1. Checking light and cable at the walkway
Date: 07 December 2021, Tuesday
1. Testing Light and cable at Cassia Playground
Date: 06 December 2021, Monday
1. Checking cables and lights around the playground area.
Date: 04 December 2021, Saturday
1. Check spotlight at walkway site
Date: 03 December 2021, Friday
1. Camera 26 is tilted need adjust
2. Checking DB Box at 1/3
3. Checking the spotlight at the walkway site
Date: 02 December 2021,Thursday
1. No junction box at end of road ½
2. Camera 28 fall down and to repair
3. Clear the unused junction box from the entrance wall to end of wall
4. Plant useless cable at the playground
Date : 01 December 2021, Wednesday
1. Pipe fall down at the entrance wall until end if wall
Monday
14-02-2022
Saturday
12-02-2022
Friday
11-02-2022
Thursday
10-02-2022
Wednesday
09-02-2022
Tuesday
08-02-2022
Monday
07-02-2022
Saturday
05-02-2022
Friday
04-02-2022
Thursday
03-02-2022
Saturday
29-01-2022
Friday
28-01-2022
Thursday
27-01-2022
Wednesday
26-01-2022
Tuesday
25-01-2022
Monday
24-01-2022
Saturday
22-01-2022
Friday
21-01-2022
Thursday
20-01-2022
Wednesday
19-01-2022
Monday
17-01-2022
Saturday
15-01-2022
Friday
14-01-2022
Thursday
13-01-2022
Tuesday
11-01-2022
Monday
10-01-2022
Saturday
08-01-2022
Friday
07-01-2022
Thursday
06-01-2022