Editorial Work
Weekly Work
Copy weekly work as black text.
Provide weekly critique of your partner's websites on their Progress Page in green.
Provide weekly responses to editor's comments in purple.
Add the words "Work completed"in red when your editor's daily work is completed.
Assignments
Critique all of their assignments on their Progress Page in green.
Respond to all of your editor's comments in purple.
Add the words "Assignment completed"in red when your editor's assignment's are completed
Weekly Work
January 21
Complete Tree-rings & climate
Make Wiki contribution
Create 13 webpages for each of the assignments - 646 site.
January 28
Create a Google Group with everyone in the class
Contribute a movie, article, poll, or photo to our 646s15 Google Community
Make a complete copy of Tree-rings & climate in your CSCS website. ALL resources must be in your own account.
February 4
Make certain that all forms, spreadsheets and graphics for your Tree Rings & Climate investigation are in your own CSCS website.
Label and add your images and selected images from your classmates into a new Google+ album in your account, and link from the Image Analysis / Microscopy assignment.
Develop a page or activity that Includes photos of petrified wood and fresh wood in your tree-rings & climate lesson.
Participate in the osmosis investigation and link to the final graph. Include your final estimate of the molarity of potatoes.
Duplicate the osmosis investigation in your own CSCS website. Make certain that you have copied all spreadsheets and images into your own account.
February 11
(2) CSCS Website
Activate Google Analytics counter
Embed a form to record visitation statistics
Embed a published line graph that shows visitors. Record weekly.
Create iFrame window to show your CSCS website on this page
Copy the Walking through graphs activity to your CSCS website. Make certain that you own all graphics and other files.
(3) Classroom Teaching Website
Activate Google Analytics counter
Embed a form to record visitation statistics
Embed a published line graph that shows visitors. Record weekly.
Create iFrame window to show your Classroom Teaching website on this page
(5) Editor / Participation
Create an iFrame to show the editorial comments and author replies.
(6) Spreadsheet / Graphing / Data Analysis
(6) Spreadsheet/Graphing Data Analysis Lesson into your own CSCS website
Complete the (6) Spreadsheet/Graphing Data Analysis Lesson through section 2.1.4. Include answers on different pages from the actual lesson.
(7) Create motion graphs that look like 5 or more of the motion graphs in Probeware (7.1).
Put the graphs in Dropbox folder
Put the graphs in a Google+ folder
Put the graphs in the Probeware (7.1) assignment
February 18
(3) Classroom Teaching Website
Update total traffic (CSCS+class sites) - total number of page view
Make sure graph shows current usage
Update table of usage on site
Enter total his in class graph & compare statistics
(5) Editorial Work
(8) Image Analysis, Microscopy
Create a photo directory in your Google drive. Make sure everyone can see it.
Add a page on fresh and petrified wood in your Tree-rings & climate CSCS lesson.
(2) CSCS Website - these three activities need to be copied into your CSCS website
February 25
Slow Motion - Put your movie in Google Drive or Youtube and embed in page
Stop Motion - Put your movie in Google Drive or Youtube and embed in page
Time Lapse - Put your movie in Google Drive or Youtube and embed in page
March 4
For each of the following, put your movie in Google Drive or Youtube and embed in page
Slow Motion, Stop Motion, Time Lapse
movement of dye in chrysanthemums
loss of mass in burning candle
Newton's cradle
Conservation of Energy - ball launcher
falling slinky
longitudinal waves
transverse waves
Circulation
March 11
Update table of usage on site
Enter total his in class graph & compare statistics
Editorial Work
(8) Image Analysis, Microscopy
Formation of silver crystals - time lapse
Arenology - include link to directory of photos of sand
(9) Mapping / GPS
Arenology - include link to directory of photos of sand
(2) CSCL/CSCS Website
Make copies of the following CSCS Activities
March 18
Cleaned up videos in Images, Microscopy, Video
adjust playback speed
correct orientation
labels as necessary
put in place public Dropbox folder or some other place without "related videos"
Graphs and Data Analysis - part 4 - scatter and line graphs
Graphs and Data Analysis - part 5 - column and bar charts
Link to map you generated in class with photos you embedded
March 25
Links to polished movie files ( slow motion, stop motion, time lapse, bacteria-manual time lapse) updated. Ones you want to show highlighted in orange.
(9) Mapping / GPS
link to your Flubaroo grade repot
Link to your copy of the collaborative map made in class
Exercise and Motion Analysis 1
link to the motion analysis data you and the class submitted
Exercise and Motion Analysis 2
Link to this activity which you are doing on your own
April 1
(9) Mapping / GPS
link to your Flubaroo grade repot
Link to your copy of the collaborative map made in class
Exercise and Motion Analysis 1
link to the motion analysis data you and the class submitted
Exercise and Motion Analysis 2
Link to this activity which you are doing on your own
Make copies of the following CSCS Activities
complete Biomes and Climographs assignment
April 15
(6) SS, Graphing, Data Analysis
Graphs and Data Analysis
Combination Plots - Biomes and Climographs
April 22
include link of movie you made with zaption
April 29
include links to class results
Endothermic and Exothermic reactions
include links to class results
(10) Collaborative Presentations
include links to class results
May 6
Make a contribution to : Ideas for Engineering Activities, grades 6-12
Make a youtube video channel.
Work on the sample class video