WATER RESOURCE PROJECTS
1. Water Quality Analysis, Hydro-Morphological, Numerical Scouring Modelling, and Riverbank Erosion and Riverbed Level Monitoring Analysis, and Monthly Monitoring Program for the establishment of Water Intake structure in Mirsharai Economic Zone. [Fund source: Consulting service for ZHEC-BOW-SMEDRIC JV]
Bankline land topography and River bathymetry, discharge & water level measurement using ADCP, DGPS RTK Trimble, Echosounder.
Hydrological data analysis, rainfall runoff, hydrodynamic modeling, erosion-accretion, flood inundation for 10-20-50-100 years RP.
Recommendations on conceptual design of hydraulic structures for flood protection measures and feasibility study.
Numerical scouring and erosion modeling and structural recommendations.
Water quality assessment along with suspended sediments, river bed, Bankline soil's physical and chemical analysis.
2. Bathymetric Survey, Hydrological Data Analysis, Morphological Modeling & Water Testing for the UCPL Power Plant Designing in Anawara, Chattogram. [Fund source: Consulting project for United Power Chattogram Limited (UCPL)]
River bathymetry and land topographic survey with geospatial mapping and AutoCAD file preparation with geo-referencing.
Hydrological data collection and analysis for rainfall, tidal water level, navigational datum levels, discharge and velocity profile analysis. Return periods analysis with goodness of fit test and suggested max flood levels.
Hydro-morphological changes like river bed, sediments, Bank line erosion-accretion, suspended sediments, bed sediments, bank soils particle size analysis with physical tests.
Flood inundation model based on primary and satellite based analyzed data. Recommendations.
3. Hydrological and flood risk analysis for a 50 MW solar power plant beside the Korotoa River in Panchagarh, Bangladesh. [Funded by Bright Night Energy, origin in USA]
River bathymetry and land topographic survey with GIS and remote sensing data analysis
Groundwater and hydrogeological condition assessment
Hydrological and hydro-meteorological data analysis and return periods analysis
Flood inundation model based on primary and satellite based analysed data
River discharge, water level, Rainfall-runoff and, stormwater management using HEC-HMS, HEC-RAS and ArcGIS and ERDAS Imagine
4. Hydrological and flood risk analysis with flood protection design review for a 200 MW Teesta solar power plant of Beximco in Gaibandha of Bangladesh. [Funded by the Beximco power Ltd, Bangladesh]
Geo-morphological and hydrogeological conditions and drainage analysis
Hydrological and flood risk analysis and max flood level simulation for 10, 25, 50 and 100 years return periods
Using GIS and remote sensing analysis hydro-morphological changes determination
Flood protection structure recommendation for the project area river embankment, drainage sluice gate, and road cum dyke at the country side with conceptual designing and BoQ preparation with cost optimization
River morphological analysis and bank-line erosion-accretion analysis and thalweg effect analysis
River bank-line shifting analysis using remote sensing and bank stability and river encroachment prediction
Drainage design, cross section, culvert opening and site storm water discharge and catchment drainage management along with necessary BoQ
5. Environmental Impact Assessment (EIA) on Proposed Bridge over the Rivers and hydro-morphological study for the construction of important rural roads in Bangladesh. [Funding from Annual Development Plan (ADP) budget of Bangladesh and client and implementing agency was Local Government Engineering Department (LGED), Bangladesh]
Environmental, social and water resources baseline study with river morphological conditions and flood risk conditions
Environmental Impact Assessment (EIA) and social impact analysis with mitigation plan, management systems and monitoring plan and implementation scheduling
River morphological and groundwater quality analysis
Review of hydro-morphological analysis, flood risk analysis and recommendations for bridge scouring, bridge construction site suitability and effective vertical and horizontal clearances for suitable navigation of that river under 5, 10, 20, 50 and 100-years flood return periods
Risk and hazard identification and mapping
6. Geotechnical and Hydrological, saline water study for a 200 MW solar power plant in Mongla, Bangladesh. [Project funded and implementation by Doreen Power Generation Company, Bangladesh]
Hydrological and hydro-dynamic modelling using HEC-RAS, HEC-HMS, HEC-SSP, ArcGIS and flood frequency analysis
Hydrogeological and groundwater table identifications and mapping within the site area
Flood inundation, sea wave front and tidal surge action modelling
Environmental and site condition assessment
Geotechnical and sub-soil investigation for soil quality testing, strength, piling depth, earth resistivity, scouring etc. by SPT, ERT, CBR measurement
7. Hydrological, environmental, solar resource and socio-economic Feasibility study for a 100MW Solar power plant establishment in Sreemangal Haor (wetland) area of Bangladesh. [Project funded by Marubeni Corporation, DNV GL Bangladesh and implemented by DNV GL Bangladesh]
Hydrological and topographical survey using drone and RTK total station
Groundwater table identification, mapping, sub-soil condition assessment
River and flood risk assessment with 10, 20, 50 and 100 years flood return periods and embankment recommendation and designing
Hill watershed analysis for the project area and flash flood from max rainfall runoff simulation through HEC-HMS
8. Hydrological and flood risk analysis for the pre-feasibility study of 100MW solar power plant in Sreemangal and Payra port area of Bangladesh. [Project funded by X-index group of company in Bangladesh]
Flood inundation and flood modelling
Hydro-geological and groundwater table and aquifer condition assessment with drainage analysis
Relevant hydraulic structure design and analysis for flood protection structure recommendations
Water resources system assessment for project development like access road, dyke, plant area structural development
Geotechnical investigations for soil and site assessment
Cost and benefit analysis for feasibility study
9. Hydrological, flood risk and storm water recommendation for a 70MW Solar Fishery power plant project in Khulna Division of Bangladesh. [Project funded by Hero Future Energies India Pvt. Ltd.]
Hydrological analysis and flood frequency analysis along with meteorological frequency distribution with max probability of exceedance for 10, 25, 50 and 100-years return periods
Hydro-geological and groundwater table layer identification, aquifer impacts on soil strength and structural vulnerability
Fisheries with solar power plant establishing project feasibility study in terms of solar resource, fishery site development, hydro-meteorological risk, site and landscape development challenges
Storm water and drainage system analysis and discharge system establishing with proper hydraulic designing
Fishery Pond height and embankment conceptual designing and technical drawings
Flood risk assessment and flood inundation mapping
Topographical survey and site landscape analysis
Geo-technical assessment with bore log analysis
10. Hydrological, Flood Risk, Storm water analysis and Geo-Technical, Geomorphological study for a 55-60MW Solar power plant in Rangunia, Bangladesh. [Study funded by Jinko solar-china and AF aries-spain and project implementation by Government of Bangladesh]
Hydrological and Flood risk assessment and flood inundation mapping
Surface water, groundwater condition assessment and mapping
Storm water system analysis and drainage recommendation
Geo-technical and sub-soil investigation with bore log analysis
11. Meghna river flow, discharge, water level measurement and surface water availability determination for 718MW combined cycle power plant near the most biggest river Meghna (GBM delta) of Bangladesh. [Study and power plant funded by Samsung C & T corporation]
Discharge and water level measurement for the study reach length of Meghna River (one the biggest river among the GBM delta in the world)
Flow velocity, tidal fluctuation measurement
Analysis for present and future water demand crisis for water availability for the study area and the power plant water demand assessment
Project site area was in Khulna region of Bangladesh. It was a wetland area called 'Beel'. The difficulty over the study area was how storm water and flood water combinedly impact the project area and recommending effective storm water management for the site area.
Hydrological, Flood risk and Flood protection structural recommendation report for a 200MW solar power plant beside the most vulnerable and flashy river Teesta of Bangladesh.
Discharge, water level and flow velocity measurement using Acoustic Doppler Current Profiler (ADCP).
Tidal river near the shore line area of Bangladesh south coast. Payra thermal power plant is located near this study area.
ENVIRONMENTAL IIMPACT ASSESSMENT PROJECTS
1. Data Collection and Necessary Support for Strategic Environmental Assessment (SEA) in the Integrated Energy and Power Master Plan Project (IEPMP) in Bangladesh. [Funded by JICA, Bangladesh and project implementing agency by the Ministry of Power, Energy and Mineral Resources of Bangladesh]
Review of regulatory framework on environmental and social issues, and relevant institutional regulations to upgrade the Strategic Environmental Assessment (SEA)
Data collection and analysis of baseline situation relevant to the plans subject to the SEA study along with water resources management and flood risk assessment and site survey
GIS database generation and mapping for the IEPMP interim report preparation and sub-sequent draft reports preparation
Stakeholder consultation with Ministries, departments, civil society organization and development partners like World bank, Asian development bank, Japan International Cooperation agency, US AID, DFID, GIZ, European commission of Bangladesh, British High commission of Bangladesh, Australian high commission, Canadian High commission etc.
2. Bangladesh Environmental Sustainability and Transformation (BEST) Project by the Department of Environement . [Funded by World Bank, implementing unit is Department of Environment under the Ministry of Environment, Forest and Climate Change of Bangladesh]
Potential risks identification for the water resources systems of Bangladesh
GIS and remote sensing based water resource analysis and mapping for the major rivers and identification of potential risks
Water governance and polices review and institutional due diligence assessment for the BEST project
Water resource planning and management improvement scoping for Bangladesh aligning SDG achievement
3. Environmental Impact Assessment (EIA) for an Pesticide based Agricultural Firm in the Industrial Area of Bangladesh. [Study and Report preparation for Growtech Agro Ltd. in BSCIC]
Environmental, water resource and ecosystem of the 2km buffer study area baseline study
Potential risk identification by the agri industry and Impact assessment for EIA study
Required document preparation to meetup the rules, acts and guidelines for environment, water resource, agricultural and ecological natural resource conservation under national governing body i.e. the department of environment
Environmental management plan (EMP) and Environmental monitoring plan preparation as a part of the EIA study and stakeholder consultation and mitigation measures for environmental and social impacts attenuation
4. Hydrological and flood risk, Environmental Due Diligence, Topographic survey, Geotechnical survey, Social and Land Due Diligence, Hydrogeological and groundwater assessment for an industry establishment by the PEPSICO Global in Sylhet of Bangladesh. [PEPSICO India Pvt. Ltd.]
Environmental Due Diligence (EDD)
Hydrological analysis & flood risk assessment
Groundwater assessment
Topographic survey and land elevation analysis
Geotechnical investigation and soil condition studies
5. Environmental Impact Assessment (EIA) on Proposed Bridge over the Meghna and Brahmaputra River in Narshingdi under the Feasibility Study for the Important Bridge Construction on Rural Roads Project by LGED. [Funding from the Annual Development Plan (ADP) of the Government of Bangladesh, implementing agency was the Local Government Engineering Department (LGED)]
Environmental Impact Assessment (EIA)
GIS based roads alignment with river and river morphological analysis
Review of hydro-morphological analysis, flood risk analysis and recommendations
6. Preparation of Zero Discharge Plan (ZDP) in accordance to environmental compliances and water re-use policy for a 226MW HFO based power plant in Bogura, Bangladesh. [Consultancy Service provided for Confidence Power Holdings Limited and presentation to the Department of Environment (DoE) of Bangladesh]
Groundwater abstraction and used by particular mechanism of the power plant and water Balance sheet preparation
Distribution of water re-use based on the different water using purposes and critical water quality analysis
Zero discharge and water re-use policy making based on the national 3R (reduce, reuse and recycle) policy and international funding agency requirement
Water and energy reduction system and working plan, regular monitoring and environmental auditing plan preparation for the power plant
7. Hydrological and flood risk, Hydrogeological and groundwater assessment, Environmental Due Diligence, Topographic survey, Geotechnical survey, Social and Land Due Diligence, for establishing PEPSICO industrial project at Habiganj of Sylhet in Bangladesh. [Consultancy Service provided for technical documentation preparation for EPC design basis and engineering purpose by PEPSICO Global India Ltd.]
Hydrological modelling and flash flood risk analysis with storm water management for the project study catchment
Potential aquifers delineation for the study area and ground water table identification
Observation of water level from the existing dug/ tube wells and validate with the source data
Collection of different hydrogeological information connected to groundwater storage such as historical groundwater hydrographs, aquifer geology, hydro-chemical data to evaluate the behaviors of groundwater storage and aquifer discharge capacity by pump test of the existing well
Groundwater quality assessment and suggesting required depth of bore-well for the industry establishment
Technical consultation with Executive Engineer of Bangladesh Water Development Board (BWDB), Jamalpur.
Korotoa river floodplain and bank erosion-accretion observation from a bridge in Panchagarh.
River bed sediment sample collection and preservation in a PTFE bottle to analyze in the laboratory.
Hydro-meteorological mapping using Thiessen polygon method and rating curve analysis to adjust the missing data.