Professional Experiences

WATER RESOURCE PROJECTS

1. Water Quality Analysis, Hydro-Morphological, Numerical Scouring Modelling, and Riverbank Erosion and Riverbed Level Monitoring Analysis, and Monthly Monitoring Program for the establishment of Water Intake structure in Mirsharai Economic Zone. [Fund source: Consulting service for ZHEC-BOW-SMEDRIC JV]

2. Bathymetric Survey, Hydrological Data Analysis, Morphological Modeling & Water Testing for the UCPL Power Plant Designing in Anawara, Chattogram. [Fund source: Consulting project for United Power Chattogram Limited (UCPL)]

3. Hydrological and flood risk analysis for a 50 MW solar power plant beside the Korotoa River in Panchagarh, Bangladesh. [Funded by Bright Night Energy, origin in USA]

4. Hydrological and flood risk analysis with flood protection design review for a 200 MW Teesta solar power plant of Beximco in Gaibandha of Bangladesh. [Funded by the Beximco power Ltd, Bangladesh]

5. Environmental Impact Assessment (EIA) on Proposed Bridge over the Rivers and hydro-morphological study for the construction of important rural roads in Bangladesh. [Funding from Annual Development Plan (ADP) budget of Bangladesh and client and implementing agency was Local Government Engineering Department (LGED), Bangladesh]

6. Geotechnical and Hydrological, saline water study for a 200 MW solar power plant in Mongla, Bangladesh. [Project funded and implementation by Doreen Power Generation Company, Bangladesh]

7. Hydrological, environmental, solar resource and socio-economic Feasibility study for a 100MW Solar power plant establishment in Sreemangal Haor (wetland) area of Bangladesh. [Project funded by Marubeni Corporation, DNV GL Bangladesh and implemented by DNV GL Bangladesh]

8. Hydrological and flood risk analysis for the pre-feasibility study of 100MW solar power plant in Sreemangal and Payra port area of Bangladesh. [Project funded by X-index group of company in Bangladesh]

9. Hydrological, flood risk and storm water recommendation for a 70MW Solar Fishery power plant project in Khulna Division of Bangladesh. [Project funded by Hero Future Energies India Pvt. Ltd.]

10. Hydrological, Flood Risk, Storm water analysis and Geo-Technical, Geomorphological study for a 55-60MW Solar power plant in Rangunia, Bangladesh. [Study funded by Jinko solar-china and AF aries-spain and project implementation by Government of Bangladesh]

11. Meghna river flow, discharge, water level measurement and surface water availability determination for 718MW combined cycle power plant near the most biggest river Meghna (GBM delta) of Bangladesh. [Study and power plant funded by Samsung C & T corporation]

Project site area was in Khulna region  of Bangladesh. It was a wetland area called 'Beel'. The difficulty over the study area was how storm water and flood water combinedly impact the project area and recommending effective storm water management for the site area.

Hydrological, Flood risk and Flood protection structural recommendation report for a 200MW solar power plant beside the most vulnerable and flashy river Teesta of Bangladesh.

Discharge, water level and flow velocity measurement using Acoustic Doppler Current Profiler (ADCP).

Tidal river near the shore line area of Bangladesh south coast. Payra thermal power plant is located near this study area.

ENVIRONMENTAL IIMPACT ASSESSMENT PROJECTS

1. Data Collection and Necessary Support for Strategic Environmental Assessment (SEA) in the Integrated Energy and Power Master Plan Project (IEPMP) in Bangladesh. [Funded by JICA, Bangladesh and project implementing agency by the Ministry of Power, Energy and Mineral Resources of Bangladesh]

2. Bangladesh Environmental Sustainability and Transformation (BEST) Project by the Department of Environement . [Funded by World Bank, implementing unit is Department of Environment under the Ministry of Environment, Forest and Climate Change of Bangladesh]

3. Environmental Impact Assessment (EIA) for an Pesticide based Agricultural Firm in the Industrial Area of Bangladesh. [Study and Report preparation for Growtech Agro Ltd. in BSCIC]

4. Hydrological and flood risk, Environmental Due Diligence, Topographic survey, Geotechnical survey, Social and Land Due Diligence, Hydrogeological and groundwater assessment for an industry establishment by the PEPSICO Global in Sylhet of Bangladesh. [PEPSICO India Pvt. Ltd.]

5. Environmental Impact Assessment (EIA) on Proposed Bridge over the Meghna and Brahmaputra River in Narshingdi under the Feasibility Study for the Important Bridge Construction on Rural Roads Project by LGED. [Funding from the Annual Development Plan (ADP) of the Government of Bangladesh, implementing agency was the Local Government Engineering Department (LGED)]

6. Preparation of Zero Discharge Plan (ZDP) in accordance to environmental compliances and water re-use policy for a 226MW HFO based power plant in Bogura, Bangladesh. [Consultancy Service provided for Confidence Power Holdings Limited and presentation to the Department of Environment (DoE) of Bangladesh]

7. Hydrological and flood risk, Hydrogeological and groundwater assessment, Environmental Due Diligence, Topographic survey, Geotechnical survey, Social and Land Due Diligence, for establishing PEPSICO industrial project at Habiganj of Sylhet in Bangladesh. [Consultancy Service provided for technical documentation preparation for EPC design basis and engineering purpose by PEPSICO Global India Ltd.]

Technical consultation with Executive Engineer of Bangladesh Water Development Board (BWDB), Jamalpur.

Korotoa river floodplain and bank erosion-accretion observation from a bridge in Panchagarh.

River bed sediment sample collection and preservation in a PTFE bottle to analyze in the laboratory.

Hydro-meteorological mapping using Thiessen polygon method and rating curve analysis to adjust the missing data.