Transportation

Capital Improvement Projects

Turtle Cove Blvd Reconstruction

(Ridge Road to Railroad Tracks)

W. Yellow Jacket Lane Reconstruction

(from Ridge Road to Greencrest Blvd)

Project Manager: Jonathon Browning, P.E.

Construction Inspector: Steve Salazar

Current Status: Under Construction

Project Scope:

  • Roadway reconstruction

  • Water line and storm drainage adjustment

Project Update:

Last Month’s (August) Activities:

  • Began utility (water lines and storm lines) installation and relocation.

This Month’s (September) Activities: (weather permitting)

  • Continue utility (water lines and storm lines) installation and relocation.

  • Once utility installation complete begin pavement removal of 1st phase of street replacement.

Next Month’s (October) Activities: (weather permitting)

  • Begin pavement replacement operations for 1st phase including setting grades, preparing subgrade, setting forms and tying steel.

Ridge Road West Reconstruction

( from Shores Blvd to N. Goliad St. (SH 205))

Project Manager: Jonathon Browning, P.E.

Construction Inspector: James Palmer

Current Status: Under Construction

Project Scope:

  • Roadway reconstruction

  • 6-ft sidewalk against back of curb on both sides of roadway

  • Storm drainage improvements


Project Update

June 10, 2022

Last Month’s (May) Activities: (weather permitting)

  • Continue storm drain improvements, subgrade preparation for pouring new concrete pavement on the north side of the road.

  • Start laying steel, formwork and paving street concrete on north side of the road.

This Month’s (June) Activities: (weather permitting)

  • Finish paving street concrete on north side of roadway.

  • Start pouring pavement for side streets and driveways.

  • Start grading and preparation for sidewalk construction on both sides of the street.

Next Month’s (July) Activities: (weather permitting)

  • Start repair of irrigation systems, fences, etc.

  • Reinstall mailboxes, sod, etc.

  • Final cleanup


For updates on this project and any other City Capital Improvement Projects (CIP), you can go to the City of Rockwall’s Engineering CIP webpage. http://www.rockwall.com/cip.asp If you would like to receive email updates on the project when they become available, please sign up for email notifications on the CIP webpage under the project of interest.



Alta Vista Drive Reconstruction

(from N. Lakeshore Drive to Westway Drive)

Westway Drive Reconstruction

(from Carriage Trail to Highland Drive)

Carriage Trail Reconstruction

(from Aspen Court to Alta Vista Drive)

Aspen Court Reconstruction

(from Highview Lane to Carriage Trail)

Project Manager: Jonathon Browning, P.E.

Current Status: Engineering Design

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

  • Construction to start after the completion of the Highland Dr., West St., First St., Kaufman St., N. Lakeshore Dr., Rusk St. – Paving, Drainage, Water and Wastewater Improvements Project

Woodpark Drive Reconstruction

(Spring Creek Drive to S. Alamo Road)

Lakedale Drive Reconstruction

(Lakeview Drive to Ridge Road)

S. Lakeshore Drive Reconstruction

(2000 Block)

Project Manager: Jonathon Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

Project Update:

S. Lakeshore Drive Reconstruction

( Summit Ridge Drive to Tanya Lane)

Russwood Drive Reconstruction

( S. Lakeshore Drive to Spring Creek Drive)

Project Manager: Jonathon Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

N. Alamo Road Reconstruction

( Live Oak Street to Downtown Couplet)

Project Manager: Jonathon Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Storm drainage improvements

W. Boydstun Avenue Reconstruction

( Forest Trace to N. Goliad St. (SH 205))

Forest Trace Reconstruction

( S. Lakeshore Drive to W. Boydstun Avenue)

Project Manager: Jonathon Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update: