Capital Improvement Projects

Turtle Cove Blvd Reconstruction

(Ridge Road to Railroad Tracks)

W. Yellow Jacket Lane Reconstruction

(from Ridge Road to Greencrest Blvd)

Project Manager: Jonathan Browning, P.E.

Construction Inspector: Steve Salazar

Current Status: Under Construction

Project Scope:

  • Roadway reconstruction

  • Water line and storm drainage adjustment

Project Update:

Last Month’s (August) Activities:

  • Complete drainage work in the the railroad right-of-way

This Month’s (September) Activities: (weather permitting)

  • Install retaining wall after franchise relocation is completed

Next Month’s (October) Activities: (weather permitting)

  • Continue retaining wall installation

Ridge Road West Reconstruction

( from Shores Blvd to N. Goliad St. (SH 205))

Project Manager: Jonathan Browning, P.E.

Construction Inspector: James Palmer

Current Status: Under Construction

Project Scope:

  • Roadway reconstruction

  • 6-ft sidewalk against back of curb on both sides of roadway

  • Storm drainage improvements


Project Update

September 6, 2022

Last Month’s (August) Activities: (weather permitting)

  • Continue installation of sidewalks

  • Continue repair of irrigation systems, mailboxes, etc.

This Month’s (September) Activities: (weather permitting)

  • Continue installation of sidewalks

  • Continue repair of irrigation systems, mailboxes, etc.


Next Month’s (October) Activities: (weather permitting)

  • Final cleanup



For updates on this project and any other City Capital Improvement Projects (CIP), you can go to the City of Rockwall’s Engineering CIP webpage. http://www.rockwall.com/cip.asp If you would like to receive email updates on the project when they become available, please sign up for email notifications on the CIP webpage under the project of interest.



Alta Vista Drive Reconstruction

(from N. Lakeshore Drive to Westway Drive)

Westway Drive Reconstruction

(from Carriage Trail to Highland Drive)

Carriage Trail Reconstruction

(from Aspen Court to Alta Vista Drive)

Aspen Court Reconstruction

(from Highview Lane to Carriage Trail)

Project Manager: Jonathan Browning, P.E.

Current Status: Engineering Design

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

  • Construction to start after the completion of the Highland Dr., West St., First St., Kaufman St., N. Lakeshore Dr., Rusk St. – Paving, Drainage, Water and Wastewater Improvements Project

Woodpark Drive Reconstruction

(Spring Creek Drive to S. Alamo Road)

Lakedale Drive Reconstruction

(Lakeview Drive to Ridge Road)

S. Lakeshore Drive Reconstruction

(2000 Block)

Project Manager: Jonathan Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

Project Update:

S. Lakeshore Drive Reconstruction

( Summit Ridge Drive to Tanya Lane)

Russwood Drive Reconstruction

( S. Lakeshore Drive to Spring Creek Drive)

Project Manager: Jonathan Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

N. Alamo Road Reconstruction

( Live Oak Street to Downtown Couplet)

Project Manager: Jonathan Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Storm drainage improvements

W. Boydstun Avenue Reconstruction

( Forest Trace to N. Goliad St. (SH 205))

Forest Trace Reconstruction

( S. Lakeshore Drive to W. Boydstun Avenue)

Project Manager: Jonathan Browning, P.E.

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update: