Transportation
Capital Improvement Projects
Turtle Cove Blvd Reconstruction
(Ridge Road to Railroad Tracks)
W. Yellow Jacket Lane Reconstruction
(from Ridge Road to Greencrest Blvd)
Project Manager: Jonathan Browning, P.E.
Current Status: Under Construction
Project Scope:
Roadway reconstruction
Water line and storm drainage adjustment
Project Update:
Last Month’s (August) Activities:
Complete drainage work in the the railroad right-of-way
This Month’s (September) Activities: (weather permitting)
Install retaining wall after franchise relocation is completed
Next Month’s (October) Activities: (weather permitting)
Continue retaining wall installation
Ridge Road West Reconstruction
( from Shores Blvd to N. Goliad St. (SH 205))
Project Manager: Jonathan Browning, P.E.
Construction Inspector: James Palmer
Current Status: Under Construction
Project Scope:
Roadway reconstruction
6-ft sidewalk against back of curb on both sides of roadway
Storm drainage improvements
Project Update
September 6, 2022
Last Month’s (August) Activities: (weather permitting)
Continue installation of sidewalks
Continue repair of irrigation systems, mailboxes, etc.
This Month’s (September) Activities: (weather permitting)
Continue installation of sidewalks
Continue repair of irrigation systems, mailboxes, etc.
Next Month’s (October) Activities: (weather permitting)
Final cleanup
For updates on this project and any other City Capital Improvement Projects (CIP), you can go to the City of Rockwall’s Engineering CIP webpage. http://www.rockwall.com/cip.asp If you would like to receive email updates on the project when they become available, please sign up for email notifications on the CIP webpage under the project of interest.
Alta Vista Drive Reconstruction
(from N. Lakeshore Drive to Westway Drive)
Westway Drive Reconstruction
(from Carriage Trail to Highland Drive)
Carriage Trail Reconstruction
(from Aspen Court to Alta Vista Drive)
Aspen Court Reconstruction
(from Highview Lane to Carriage Trail)
Project Manager: Jonathan Browning, P.E.
Current Status: Engineering Design
Project Scope:
Roadway reconstruction
Water line replacement
Wastewater line replacement
Storm drainage improvements
Project Update:
Construction to start after the completion of the Highland Dr., West St., First St., Kaufman St., N. Lakeshore Dr., Rusk St. – Paving, Drainage, Water and Wastewater Improvements Project
Woodpark Drive Reconstruction
(Spring Creek Drive to S. Alamo Road)
Lakedale Drive Reconstruction
(Lakeview Drive to Ridge Road)
S. Lakeshore Drive Reconstruction
(2000 Block)
Project Manager: Jonathan Browning, P.E.
Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)
Project Scope:
Roadway reconstruction
Water line replacement
Wastewater line replacement
Project Update:
1st Public Meeting - with Adjacent Property Owners (4/23/2019)
2nd Public Meeting - with Neighborhood (07/10/2019)
S. Lakeshore Drive Reconstruction
( Summit Ridge Drive to Tanya Lane)
Russwood Drive Reconstruction
( S. Lakeshore Drive to Spring Creek Drive)
Project Manager: Jonathan Browning, P.E.
Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)
Project Scope:
Roadway reconstruction
Water line replacement
Wastewater line replacement
Storm drainage improvements
Project Update:
1st Public Meeting - with Adjacent Property Owners (4/29/2019)
2nd Public Meeting - with Neighborhood (07/17/2019)
N. Alamo Road Reconstruction
( Live Oak Street to Downtown Couplet)
Project Manager: Jonathan Browning, P.E.
Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)
Project Scope:
Roadway reconstruction
Storm drainage improvements
W. Boydstun Avenue Reconstruction
( Forest Trace to N. Goliad St. (SH 205))
Forest Trace Reconstruction
( S. Lakeshore Drive to W. Boydstun Avenue)
Project Manager: Jonathan Browning, P.E.
Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)
Project Scope:
Roadway reconstruction
Water line replacement
Wastewater line replacement
Storm drainage improvements
Project Update:
1st Information Public Meeting - with Neighborhood (10/16/2019)
2nd Information Public Meeting - with Neighborhood (01/23/2020)