Capital Improvement Projects

S. Lakeshore Drive/Summit Ridge Drive Reconstruction

(From SH 66 to FM 740)

Project Manager: Jeremy White, P.E., CFM

Construction Inspector: James Palmer

Current Status: Under construction

Project Scope:

  • Roadway reconstruction with sidewalks

  • Alley reconstruction (certain alleys)

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

  • See Project Location Map – Blue highlighted alleys

  • Project Schematic

Project Update:

    • Finish the final work of grading, irrigation, mailbox repair, and sodding

    • Finish work on punch list items to close out project.

Highland Dr., West St., First St., Kaufman St., N. Lakeshore Dr., Rusk St. – Paving, Drainage, Water and Wastewater Improvements

Project Manager: Jeremy White, P.E., CFM

Construction Inspector: James Rice

Project Scope:

These Improvements are a part of the 2018 Street Bond Program and the City’s current Water/Wastewater Rehabilitation Program. Below is a list of what construction is being performed on each location of the project.

  • Highland Drive (from Driftwood Drive to Valley Drive) and West Street (from Highland Drive to Rusk Street) will be full pavement width, roadway reconstruction projects that will add a six (6) foot sidewalk against the back of curb (where existing right-of-way width allows) on both sides of the road. These projects will also include the construction of new eight (8) inch PVC water and wastewater lines that will replace the existing cast iron and clay tile lines currently running adjacent to Highland Drive and West Street.

  • The First Street, Kaufman Street and Rusk Street projects will include the construction of a new eight (8) inch PVC water that will be looped into the existing system. This will replace an existing two (2) inch cast iron line that currently dead ends on Kaufman Street. No roadway reconstruction is planned with these street projects.

  • The N. Lakeshore Drive project includes the construction of new water, wastewater and storm drainage lines. These lines will tie into the roadway reconstruction projects planned for Alta Vista Drive, Carriage Trail and Westway Drive that are currently being designed under the 2018 Street Bond Program.

  • The west alley (Alley 1) behind Valley Drive (from Westway Drive to Highland Drive) includes construction of a new wastewater line including replacement of Alley pavement.

Please see location map (here) for overall project limits.

Project Update:

  • Last Month’s (February) Activities:

(Delays due to winter storm and rain events)

    • Highland Drive (Driftwood Drive to Valley Drive)

      • No work at this time.

    • N. Lakeshore Drive

      • Finish cleanup in this area (sodding, irrigation repair, etc.)

    • West Street, First Street, Kaufman Street and Rusk Street

      • Continued new water line installation and performed water line tie-ins.


  • This Month’s (March) Activities: (weather permitting)

    • Highland Drive (Driftwood Drive to Valley Drive)

      • No work at this time.

    • West Street, First Street, Kaufman Street and Rusk Street

      • Finish new water line installation and water line tie-ins.

      • Begin demolition of half of street pavement and placing new subgrade.

      • Begin street pavement replacement of half of street.


  • Next Month’s (April) Activities: (weather permitting)

    • Highland Drive (Driftwood Drive to Valley Drive)

      • Begin work of alley pavement removal behind 301-305 Valley Drive.

      • Begin new sanitary sewer installation in alley after pavement removal.

    • West Street, First Street, Kaufman Street and Rusk Street

      • Finish street pavement replacement on first half and move to the other side for demolition and replacement.

Turtle Cove Blvd Reconstruction

(Ridge Road to Railroad Tracks)

W. Yellow Jacket Lane Reconstruction

(from Ridge Road to Greencrest Blvd)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Storm drainage adjustment

Project Update:

Ridge Road West Reconstruction

( from Shores Blvd to N. Goliad St. (SH 205))

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Storm drainage improvements

Project Update:

Alta Vista Drive Reconstruction

(from N. Lakeshore Drive to Westway Drive)

Westway Drive Reconstruction

(from Carriage Trail to Highland Drive)

Carriage Trail Reconstruction

(from Aspen Court to Alta Vista Drive)

Aspen Court Reconstruction

(from Highview Lane to Carriage Trail)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering Design

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

  • Construction to start after the completion of the Highland Dr., West St., First St., Kaufman St., N. Lakeshore Dr., Rusk St. – Paving, Drainage, Water and Wastewater Improvements Project

Woodpark Drive Reconstruction

(Spring Creek Drive to S. Alamo Road)

Lakedale Drive Reconstruction

(Lakeview Drive to Ridge Road)

S. Lakeshore Drive Reconstruction

(2000 Block)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

Project Update:

S. Lakeshore Drive Reconstruction

( Summit Ridge Drive to Tanya Lane)

Russwood Drive Reconstruction

( S. Lakeshore Drive to Spring Creek Drive)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update:

N. Alamo Road Reconstruction

( Live Oak Street to Downtown Couplet)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Storm drainage improvements

W. Boydstun Avenue Reconstruction

( Forest Trace to N. Goliad St. (SH 205))

Forest Trace Reconstruction

( S. Lakeshore Drive to W. Boydstun Avenue)

Project Manager: Jeremy White, P.E., CFM

Current Status: Engineering design (topographic & ROW survey) no construction anticipated at this time (design only)

Project Scope:

  • Roadway reconstruction

  • Water line replacement

  • Wastewater line replacement

  • Storm drainage improvements

Project Update: