Here is the list of our projects for this trip, organized by the community partner requesting the project. Each project has the current status and some details.
El Plantel:
- Weather Station (Completed)
- Collected May prototype from the farm
- Designed and implemented a new prototype with a PCB and better packaging
- Seed Database (Ongoing)
- Created back end database system
- Creating front end user system
- Bee Hive Alert System (Future)
- Gathering information while here to design it during the Spring semester
- Computer for Lexis (Completed)
- Updated and repaired laptop for Alexis (worker at El Plantel) to learn spreadsheets and other computer skills
FUPROSOMUNIC:
- French Drain (Completed)
- Designed drains
- Constructed two drains (one for the kitchen and one for the restaurant)
- Designed third drain to be built once the fruit processing house has a sink
- Hillside Map (Ongoing)
- Gathering information; it looks like Google Maps will support our goals
- Mini Bee Hive Plans (Completed)
- Researched how to align levels and avoid sticking
- Modeled and built proposed bee hive
- Mycorrhiza Reproduction (aka Mushroom dirt) (Completed)
- Decontaminated and inoculated three bags of dirt
- Green House (Ongoing/Future)
- Gathered information and brainstormed ideas
- Figuring out how to cure bamboo to prevent rot and insect damage
- Pond Design and Ideas (Future)
- Gathering information while here to design it during the Spring semester
Frater:
- Irrigation System (Future)
- Figure out current status and maintain
Casa Nica:
- Back Clothesline (Completed)
- Drilled holes in new board and repaired system
- Front Trellis (Completed)
- Drilled holes in new boards and installed boards
- Grand Banqueting Table (Future - for Josh)
- Refinish so we can continue to enjoy this work space
- Bathroom Sink (Completed)
- Cloth Chair Repair (Completed)
- Replaced cloth portion of chair
- Security Cabinet for tools (Completed)
- Designed security cabinet
- Cut and assembled everything
- Cleaned up the edges with the router and painted
- Food Processor (Completed)
- Modified the switch to stay on (since lid lost the plastic part that would engage the switch)
- Light over the Big Table (Completed)
- Replaced the fixture so that the bulbs don't keep burning out
- Coffee Percolator (Completed)
- Fixed coffee percolator that would not heat