District: Garden District - Partial Control
Owner: Three Gsi LLC
HDLC Staff: Dennis Murphy
Rating: Contributing
Applicant: Garret Willis
Permit #: 24-09920-HDLCÂ
Description: New construction of a 10,300 SF three-story, multi-family residential building including demolition of an existing Contributing rated one-story, single-family residential building to grade.
Previous ARC Recommendations:Â
06/18/24: The ARC voted to defer the application for additional review. The ARC also agreed that:
The building’s overall massing, architectural detailing, presence on the street, and ground floor treatment (including proposed garage doors) are still too suburban in character and do not appear to be compatible with the existing historic context.Â
The building is also prominently visible from St. Charles Avenue, not just Toledano Street, and so it must relate to all its surrounding contexts.
The ground floor treatment should be reconsidered and revised to mitigate the impact of the proposed garage doors and to better relate the building massing and detailing to the pedestrian experience. For example:
The building massing could be pulled forward and closer to the front property line, with the garage doors recessed further back to reduce their visibility.Â
The front entry doors could be shifted forward in plane so that they have increased visual prominence over the garage doors.Â
The garage doors could be replaced with simple metal gates, so the area reads more as an open-air carport than as a typical enclosed garage.
A small entry porch or increased prominence of the entry doors (such as a simple metal awning covering) would be more contextual and provide additional visual interest.
The overall building massing and the dynamic nature of the bold, colorful, articulated-stucco shapes of the design are quite aggressive and appear too distinct and incompatible with the types and styles of buildings commonly seen in the surrounding historic districts.
The applicant should reconsider and refine the massing and architectural expression of the building so that overall, it is more subtle and subdued.Â
The multiple stepping at the roof line is too busy and fussy and should be simplified.
The applicant should look at other successful new construction projects in the area for reference and should document some precedent examples of similar nearby buildings that feature contemporary designs and visually prominent garage doors to better clarify how the proposal is compatible with the surrounding context. Â
05/14/24: The ARC voted to defer the application for additional review. The ARC also agreed that:
The 3-story massing could be considered appropriate here based on the existing adjacent context; however, the overall details need to be further studied and refined.Â
The building’s overall proportions appear a bit too squatty, and the applicant should increase the first-floor floor-to-ceiling height.Â
The prominence of the garage doors at the front elevation is too suburban in character, is not considered appropriate for St. Charles Avenue or the Garden District and will likely require a variance for multiple curb cuts.
The applicant should investigate alternative ways to accommodate parking on the site, such as utilizing a single garage door that can provide access for all units.
The recessed front entry door condition may cause the garage doors to appear more visually prominent at the first floor and should be reconsidered to enhance the pedestrian experience.
The side elevations appear too flat and commercial in character, and the openings should utilize operable windows that are installed recessed into the wall depth. Â
The proposed material palette and details should be further developed and refined.Â
For example, stucco control joints should be indicated on the elevation drawings to demonstrate their relationship to the window openings.Â
The applicant should provide additional 3D perspective views taken at street level, including the view from St. Charles Avenue, to better demonstrate the building’s scale, massing, and context.Â
The applicant should refamiliarize themselves with the HDLC Design Guidelines for new construction and should meet with Staff to refine the drawings prior to the next ARC meeting.