A 2-way golf car path from San Marino Drive all the way to the existing path at the 466 gate
From San Marino to the Mail Station along the fence on the West side of Morse
Widen the existing boardwalk from the mail station to Carrera Drive to accommodate 2-way traffic
Cross Morse at Carrera Drive. A traffic light would be installed at this intersection.
Path goes along the wall on the East side of Morse, connects to the existing path at the 466 gate
The entire path can be installed without the need to remove any live oak trees.
Golf carts would no longer need to travel on the shoulders of Morse Blvd south of San Marino Dr.
This would enable the possibility of 2 additional options:
A bridged walking path along the West side of Morse Blvd from Carrera to Barraza
A center turning lane on Morse Blvd extending from San Marino to the 466 gate