For this project I was given elevation information at four different station points over a span of 150 ft of a straight flat road. I was then tasked to use the given information on existing grade elevations, road materials, and geometry to draw stations for each station section. From this I was to determine the amount of cut and fill for the project as well as the amount of material needed. To aid with correct dimensions I was given a revised standard plan from the Department of Transportation on curbs and driveways (RSP A87A).