My Role in these projects ranged from back of the house Estimator, Lead Estimator to Full on Project Management. All of the credit goes to the Architects and Engineers who designed them, the tradesmen who performed the work and most importantly the General Contractors who took on most of these jobs at risk and made the plans a reality .
40 Peck Slip- The NYPD Superior Officers Council- Another project that was like building a building within a building. Two stories added to a four-story landmark building, new elevator added, micro piles and footings to support the new steel that spans from the first floor to the penthouse. Full gut demolition and motion monitoring of adjacent buildings. Lump Sum Bid
62 Wooster Street- An 8 story Landmarks Building in SOHO that was like building a new building within the fascia of an existing building. New underpinning de-watering and superstructure within the existing shell. New structural steel spanning from the basement to the roof for an outdoor swimming pool and penthouse. The highest end luxury condominiums with statuary bronze finishes and hand rubbed plank flooring over acoustically engineered multi-layers substrates. At Risk Lump Sum Bid
New York Presbyterian Suite for Occupational Services 1.2 Mil. Chief Estimator Medical expansion and renovation - At risk Lump Sum Bid
New York Presbyterian Wright Center for the Aging - 3.9 mil. At Risk Lump Sum Bid
Mount Sinai - Temporary Infusion -1.2 Mil Infusion Center - Chief Estimator At Risk Lump Sum Bid
Memorial Sloan Kettering Cancer Center - 9.8 Million Dollar Laboratory with complex HVAC and Plumbing scopes of work- from conceptual to 100% CD, Preconstruction Estimator – CM proposal
New York Presbyterian - Queens outpatient Clinic 2.8 Million Dollar Medical Facility Preconstruction/Estimator - Lump Sum Bid w Set rates for CM Master Contract
Fashion institute of Technology- The "A" building lobby renovation. David Smotrich and Partners. Fast track renovation consisting of retrofitting existing wood metal atrium railings with custom glass panels, new millwork, light fixtures and tel/data infrastructure to allow students internet access and faculty access control. - At Risk Lump Sum Bid Estimator/Project Manager
Fashion institute of Technology- estimator and project manager for the David Dubinsky Faculty Lounge renovation. David Smotrich and Partners. Custom perforated metal panel ceiling system with integral lighting that looked like metal ceiling panels when not illuminated. Lutron lighting controls and BMS tie-ins. A very high end finished product where the execution of the finishes was paramount. At Risk Lump Sum Bid Estimator/Project Manager
Brooklyn College - Roosevelt Hall- Multiple Interior Renovations and Change of Egress. CUNY-At Risk Lump Sum Bid Estimator/Project Manager
Brooklyn College - ADA upgrades to the Brooklyn College Campus, New Entrance ways, New Stairs, Full Gut bathroom renovations, New ADA Lifts and New Elevators- At Risk Lump Sum Bid Estimator/Project Manager
250 Fifth Avenue Hotel. A new tower connected to a Landmarks Mansion on Fifth Avenue. Double depth Cellar and Sub-Cellar, Zero Access agreement with the neighboring garage made for an interesting SOE and Foundation design. Large portions of the existing fa9ade had to be shored up and maintained during Construction. Additional Stories and penthouse added to the existing mansion. High end interior finishes and custom millwork throughout the hotel. 59 Mil. Negotiated CM Fee Split Savings
Hotel- 12 East 48th Street- New Out of the ground 128 Key High-Rise Hotel. Hidrock Properties. Drilled caissons and mat slab foundation system, monolithically poured Concrete Superstructure with a 3D panel Facade system. A sliver building located on 48th Street Logistically challenging location with a limited access SOE and foundation scope and coordination with owner furnished FF&E. 50 Mil. Negotiated CM Fee Split Savings
Sigma - New ground-up construction of a new 6,900 SF distribution warehouse and the renovation of 10,000 SF of office area, along with site upgrades to parking lot amenities and landscaping. Construction of both the new warehouse and renovation of existing office area were performed as normal day-to-day business operations were ongoing, At Risk Lump Sum Bid
National Rent a Car La Guardia Airport-
5 New Buildings on an existing Site that had to stay functional and operational during construction. A Logistically challenging Project that included the demolition of existing fueling stations and tanks, Car wash buildings, Car rental Buildings and Car servicing stations with New. Entire Site need to be bought to a new Grade, New greywater drainage, Parking systems, Asphalt paving, Asphalt pavement markings, Waiting Canopies, Helical Piles and Footings for new Buildings, Veeder-Root fueling systems and fuel tanks with complex control diagrams and relays built into the safety systems. – At Risk - Lump sum Bid
JFK Terminal 4 - East Box Addition – New Addition to the existing terminal 4 - added baggage claim, Restrooms
Coordination with Air Train Reconfigure and BOH Facilities. - At Risk Lump Sum Bid
MTA Police Facility - Merrick Station- New police Facility for the Metropolitan Transit Authority - High Security Facility . At Risk Lump Sum Bid