Drilling holes through 3/16 inch steel proved to be a challenge
Assembling the roof rafters
Framing the kiosk signboard
All of the pieces, arranged for staining
Everyone who attended the work day (about 15 people) was hands-on the entire time
We had to ensure that the over 600 lb structure was level and secure throughout the entire day
We used over 15 bags of concrete for the foundations of the posts, which had to be hand-mixed, then poured in lifts over 2 hours
In total, over 25 people helped throughout the course of the day
over 100 service hours completed
A smaller group of about 10 was needed to stain all the pieces
over 25 service hours completed
About 15 people came to assist with the installation of the final kiosk, which we assembled and poured foundations for
over 100 service hours completed