This document provides the process for Infrastructure and Environment.
This document covers the procedure for the practices that must be followed for compliance of ISO13485
(Version at end of page)
Signed V2 NG 01.07.2025
The process covers all documents and process and products as defined in the SOP
Approval: Bruce Manuel
Changes: Nicholas Gilbert
Infrastructure - building, lights, floors, windows, perimeter, equipment relevant to the operations / SHEQ
Environment - the working condition appropriate to GMP / requirements of the product e.g. cleanliness, storage conditions
Maintenance - this is required for preserving the condition of an item (infrastructure, machinery, products)
Refurbishment - the process used to return medical devices to a condition of safety and effectiveness comparable to when new and without significantly changing the equipment's performance, safety specification and/or intended use as in its original registration (eg: sharpening scissors)
GMP - Good manufacturing, distribution, storage, stock management practices
SHEQ - Safety, Health, Environment and Quality
NCCA – Non Conformance Corrective Action
SOP – Standard Operating Procedure
ISO13485 Clause 6.3 & 4
SOP Non-Conformance, Deviations and Concessions & Corrective Action
SOP Cleanliness, Health & Safety
SOP External Providers (Purchasing & Supplier Management)
Infrastructure and maintenance are part of the OUTSOURCED arrangements refer OUTSOURCED ACTIVITIES
Under Infrastructure and Environment the organization provides requirements for the maintenance and planned maintenance activities, including the interval of performing the maintenance activities, when such maintenance activities, or lack thereof, can affect product quality. As appropriate, the requirements apply to equipment used in operation, the control of the work environment and monitoring and measurement and records of such maintenance are maintained. This is provided through the Outsourced Subcontract Manufacturer or Outsourced Activities.
Work environment and contamination control (6.4) follows above however if any maintenance, or preventative maintenance of furnishings, fittings or equipment is required, then it is to be reported to the Manager in order for the maintenance to be arranged.
This preservation includes identification, handling, packaging, storage, and protection and also applies to the basic parts of a product
Suppliers are approved by SOP External Providers
In the event of any reported to PMB a non conformance incident can be logged following SOP Non-Conformance, Deviations and Concessions & Corrective Action SOP is followed
Where there is monitoring and measurement undertaken, the monitoring and measuring equipment needed to provide evidence of conformity of product to determine requirements.
This is provided through the Outsourced Subcontract Manufacturer or Outsourced Activities.
In the event of non compliance follow SOP NON CONFORMANCE CORRECTIVE ACTION
[Risk Assessment to is found in SOP PREVENTIVE ACTION RISK ASSESSMENT refer Document]
An analytical review is reported monthly to management and this forms part of the input through Data Analysis to management review
The Trend should pick up any potential and recurring incidents, where corrective action must be reported at the management review to facilitate continual improvement.
Revision 2 NG 01.07.2025 changed ownership. PT 8.2.2 removed general manager.
Revision 1 - New HJM 5.09.2024
Name Retained by/ in Retention period Hard copies Destroyed by
Maintenance Records OSM / OQ