Refurbishments
Main Hall
The wooden floor was sanded and revarnished in 2022. The hall was repainted during lockdown and new blinds were put up. Also, a new floor was put in the foyer.
Community Room
There is a new outside door. A new floor was put in the foyer and hall during lockdown. Also new blinds and the room was painted.
Toilets
The ladies and gents toilets were refurbished.
Kitchen
There is a new floor in the kitchen and it was also painted during lockdown.
Lighting
New lighting was installed in the Community Room and its Foyer, the Main Hall Foyer, kitchen and ladies toilets and the Holme Helpers Foodbank room. The walkways and the toilets are on sensors.