The objectives of this project are to obtain an appropriate reservoir sedimentation management system and to study the arrangement of reservoir areas in order to achieve effective dam management.
The objectives of this project are:
a. To obtain performance data information consisting of technical data, physical conditions, functions, operation plans, classification, and program plans for the Dam and Reservoir (BPA);
b. To determine the amount of routine operation and maintenance (OP) costs, periodic OP costs, and special OP costs for the Dam and Reservoir (BPA) and recommend efforts needed to ensure the sustainability of the Dam and Reservoir (BPA) functions;
c. To build a database to be incorporated into the GIS (Geospatial Information System) program containing information such as coordinate points, performance values and AKNOP (Analysis of Operation and Maintenance Costs), and technical data for the Dam and Reservoir (BPA).
The objective of this project is to prepare technical planning documents for the optimal improvement of flood control measures in the Jababeka Industrial Estate area, which can serve as an accurate guide during the construction phase according to field conditions.
The objective of this work is to control the smooth implementation of construction work at the Coastal River Regulation II (PPK Sungai Pantai II), NVT Work Unit for the Implementation of the Cidanau-Ciujung-Cidurian Water Source Network Fiscal Year 2020, in order to achieve work results that comply with the technical requirements in the contract, and can be completed within the specified time, cost, and quality so that the work implementation can proceed efficiently and effectively. This includes fulfilling detailed design results, design reviews, and construction work implementation from managerial aspects
The objective of this work is to control the smooth implementation of construction work in the Irrigation and Marsh Land Project Office, NVT Work Unit for the Implementation of the Water Utilization Network of Ciliwung Cisadane for the Fiscal Year 2017, in order to achieve work results that comply with the technical requirements in the contract for the Rehabilitation of the Main and Secondary Channels of West Cisadane D.I. Cisadane, Tangerang Regency, and can be completed within the specified time, cost, and quality so that the implementation of the work can proceed efficiently and effectively, and to fulfill the detailed design results, design reviews, and construction work implementation from managerial aspects
The objectives of this work are:
Availability of an adequate number of supervisory staff.
Availability of competent supervisory staff.
Effective implementation of construction work supervision.
Support for the Project Implementation Unit (PPK) in controlling construction activities carried out by Construction Service Providers