What problems did the engineers identified when designing the bridge? Identify 5. They had to find a design that can survive an earthquake when it happens. The bridge also had too be over 8 miles long. They a
What was the criteria and constraints of the bay bridge? Identify 5 criteria and 5 constraints.
Explain what it means by “it was designed to fail.”It means that the bridge
Explain “self anchored suspension.” it means instead anchoring it into the earth it anchors it into itself.
What did the designers do to modify the bridge to improve it and make it safer from the previous design?They used self anchored too improve the design and make it safer.
Google an arch bridge. Compare and contrast the Bay Bridge’s design and an Arch Bridge. What are some limitations and and benefits of each design?arch bridges are very different too the bay bridges design.The arch bridge is a bridge with a curved arch while the bay bridge is a straight bridge with a straight arch.
Our team searched up pictures and also watched the video from Mr.Fuge too come up with our design. Mr.fuge gave us recommendations and that's what we went with. Those pictures and the video helped us design the bridge.