Sleep Preventor
Parts List:
Buzzer
Potentiometer
2k resistor
2x photo resistors
2N3904 Transistor
switch
PBC board
9V battery clip
9V battery
1. When sufficient light shines on the photo resistors, resistance and therefore voltage is low and the buzzer is silent.
2. When lights are off, resistance and voltage are high, so the buzzer turns on.
3. Potentiometer is used to adjust to different light settings.