Buzzer
1. When the lights are on the resistance of the photo resister is low revers biasing the resistor, causing the buzzer to be off.
2. When lights are off the resistance of the photo resistor is high forward biasing the resistor, turning the buzzer on.
3. the pot is used to adjust for different lighting.
4. lights on low voltage. lights off high voltage.
Parts list;
pot
buzzer
1 photo resister
1k resistor
1 3904 transistor
9v battery
wire