The Screamer was designated to scare people when least expected. When the lights go off it buzzes scaring your victim.
Description
1. When the light is turned on the photo resistor gets no voltage and makes the buzzer make no noise.
2. Opposite goes for when the light is turned off the photo resistor gets max voltage and makes the buzzer go off and buzz.
3. The POT controls how much amount of lighting may go into the photo resistor and may stop the buzzer from going off.
4. The switch completely stops the buzzer from being able to go off.
Schematic
(Has link for bigger image)
Parts
Buzzer
1K resistor
photo resistor
POT
9v Battery
3904 Transistor
Picture of Buzzer
(Click picture for bigger image)