Deliverables
Herebelow, you will find the final versions of the deliverables of the project
Initial D1.1 (Requirements in terms of WWTP regarding water quality needed for reuse) and D1.3 (Validated models of treatment processes (aerobic MBR) ) have been grouped in the deliverable D1.i Guideline Matlab/Simulink WRRF platform
D1.ii Validated crop models to be used for set-point generation
D2.1: Report on literature, selection of case studies, implementation/comparative analysis
D2.2: Online optimal control and estimation of treatment-reuse systems
D2.3 Performance indices of the wastewater reuse and reclamation system
D3.1.i: Univariate Fault Detection in a Wastewater Treatment Process
D3.1.ii: Multivariate Fault Detection in a Wastewater Treatment Process
D3.2: Control performance indices review
D4.1: Report on the evaluation of scenarios in simulation for Control4Reuse
D4.2: Report on the evaluation of scenarios for Control4Reuse