Heres a way to present data from revit in a meaningful way: Understanding utilization and therefore spare capacity of existing foundations.
E = Existing Value
T = Calculated Value
% = Utilization
Shading (from Green to Red) is applied according to the % Utilization.
Green (0%) to Red (100%)