This is the main lesson that we learned from our robot building experience. If we had moved all of our timelines up and tested the cam system early in the term, we would have had enough time to order a stronger motor before competition.
The manufacturing of the robot took a long time. We expected this and were prepared to spent a lot of time in the shop but we ended up facing some unexpected challenges such as the availability of the tools and not being allowed in the wood shop.