Objective: Design and build a shop improvement system that creates a more efficient, organized and LEAN work environment
Criteria/Constraints:
Fully functional product
Meets original design objective
Must be completed before February Break
Must directly solve a problem related to the manufacturing shop
Requirements
Completed Project Outline Slideshow
Engineering Process
Project Instructions
Prototype
Sketches with dimensions
Tools:
all tools
3d printers, laser, CNC
Materials
1/8th", 1/4", 1/2", 3/4" plywood
3/4" pine and poplar wood boards
carboard
acryclic
Instructions:
Work in groups of 2-3 to design and build a fully funcitonal shop improvment product or system. Groups need to work together to complete all aspects of the project outline (engineering process) while working through their design challenge.
Resources
Examples