May 5th - Initial Brainstorming session for Design Reviw
May 13th - Full BOSYN state machine and communication code written and tested in simulator
May 7th - CAD for BOSYN, BOAT, and BYT(ER) completed
May 8th - Planned out all state Machines for the BOAT and BOSYN
May 15th - XBee Communication Tested, learned about the 0x89 message in more detail
May 16th - Tested internal housing unit for BOAT electronics
May 20th - Buoyancy tests for wight distribution with BOAT (with only pink foam)
May 20th - 6 Continuous minutes of sucessful XBee communication
May 21st - Paddle wheel testing across the pond
May 24th - BYT(ER) design finalised
May 26th - Full electronic integration for the BOAT
May 27th - BOAT-BOSYN Full Integration testing before final assembly
May 30th - Final Check off, overall system worked really well, BOSYN had minor connectivity issues (loose wires)
May 31st - Competition Day (while everything worked)
May 31st - First Round as a HUNTR, only BOAT to reach the PREI (but missed their BAYT)
Bitbucket commit history which captures lots of our frustrations and pain points