In 2025, City of Blanco voters approved bond propositions authorizing:
$12 million for water and wastewater utility improvements
$4 million for street and roadway improvements
Together, these propositions authorized up to $16 million in bonds for projects intended to improve the reliability, condition, and long-term performance of the City’s infrastructure.
In 2026, the City sold approximately $3 million in bonds as the first bond tranche. This initial financing supports a coordinated group of water, wastewater, and street projects focused on infrastructure planning, system evaluation, rehabilitation, and construction.
Current projects include:
The bond program is intended to address aging infrastructure before failures become more frequent or expensive. The first tranche combines construction projects with planning and inspection projects so that future investments can be based on better information.
These projects are expected to help the City:
Reduce water leaks and service interruptions
Improve wastewater system reliability
Extend the useful life of existing facilities
Reduce inflow and infiltration into the wastewater system
Improve the City’s ability to plan for growth
Prioritize future projects using inspection and modeling data
Restore and improve City streets
Reduce emergency maintenance and unplanned repair costs
Voter approval authorized the City to issue bonds up to the approved amounts. It did not require the City to issue all authorized bonds at one time.
The City may sell bonds in separate groups, or tranches, as projects are developed and funding is needed. This phased approach allows the City to:
Match borrowing with project readiness
Refine project costs before issuing additional debt
Coordinate design, bidding, and construction schedules
Consider current financial conditions
Review future priorities before each bond sale
The 2026 bond sale represents the first tranche of the voter-approved program.
Some projects involve studies or inspections and may create little or no disruption. Construction projects may temporarily affect traffic, driveway access, water service, or nearby properties.
The City will provide project-specific notices when work is expected to cause:
Planned water outages
Lane or road closures
Temporary access limitations
Construction near homes or businesses
Changes to a project schedule
The City and its contractors will work to minimize disruptions and maintain access whenever practical.
The City of Blanco is committed to responsibly implementing the voter-approved bond program and keeping the public informed. By combining immediate improvements with long-term planning, the City is working to protect existing infrastructure, improve service reliability, and prepare Blanco for the future.
No. Voters authorized the City to issue up to $16 million in bonds, but the City did not issue the entire amount at once. Approximately $3 million was sold in 2026 as the first tranche.
A tranche is one portion of a larger authorized bond program. Issuing bonds in phases allows the City to align financing with project schedules and funding needs.
Not necessarily. Some budgets are preliminary estimates and may change as design progresses, regulatory reviews are completed, and construction bids are received.
The first tranche emphasizes projects that address infrastructure condition, system reliability, water loss, wastewater inflow and infiltration, maintenance needs, and long-term capital planning.
No. Some projects involve engineering studies, system modeling, inspections, or data collection. These projects help the City determine where future construction funds should be invested.
The City will post project updates and provide notices before significant traffic changes, planned water outages, or other anticipated impacts whenever practical.