Generally speaking in today's solar industry with the advent of PCS settings with Enphase and the utilization of sub panels to do reroutes aka Hawiian Tie ins the need for MPUs (Main Panel Upgrades) has heavily diminished. Traditionally the solar industry in CA has seen an MPU rate around 20-25%. Today for Skyline that number is under 10%. The only real reason for an MPU these days is because the current main panel is out of compliance. See below some examples of panel types that are no longer code compliant and allowed by AHJs therefore requiring an MPU to occur.