At Skyline Smart Energy, we pride ourselves on the speed and efficiency of operations to ensures a seamless experience for both you and your clients. Our step-by-step timeline outlines everything you and your customers will experience, from the initial sale to installation and activation.
We’ve streamlined the process to reduce delays and prevent surprises, helping you maintain momentum with your customers. Our team is here to support you at every stage, making sure that every detail, from financials to technical is aligned. With our process, you can confidently guide your clients through each step, knowing that each phase is handled with care and profesiionalism.
Our goal is to ensure that both you and your customers have a smooth experience, resulting in faster installations, satisfied clients, more closed deals and lots of refarrals!
Sale completed, and the survey is typically scheduled within 1-3 days.
If the sale happens on a Monday, the survey is usually conducted on Tuesday.
Homeowner availability can lead to delays, but typically within a few days.
The survey is done same day or as quickly as possible after scheduling.
The survey sets up the necessary site analysis for the solar design.
The survey is sent to design once completed.
We currently use Aurora for design, with plans to bring it in-house for faster turnaround.
Our head of design ensures all designs meet a rigorous 85-point quality check before approval.
Any errors in the plan set are corrected to ensure accuracy.
The design process focuses on quality as well as speed.
Time Consideration: 2 days for approval or rejection
CPR (Commission Plans Reconciliation) ensures financial accuracy, module layout, and battery placement are all correct.
Sales reps have 48 hours to approve or reject the CPR, and it’s automatically approved if there is no response.
Any issues or financial discrepancies are addressed immediately.
The aim is to maintain transparency between the sales rep, the homeowner, and the company.
The CPR ensures that all parties are aligned before moving forward.
Time Consideration: 1-7 days (depending on submission method and potential delays).
After CPR approval, the permit submission begins.
Solar app or online submission speeds up the process (typically 1 day to submit).
In-person submissions can take up to a week.
Permits may be delayed due to HJ delays or rejections due to incorrect design.
The team actively manages these delays to avoid unnecessary hold-ups.
Time Consideration: 0-60 days (depending on jurisdiction and issues).
Permit approval time ranges between 0 and 60 days, depending on the jurisdiction.
Instant approvals happen via solar apps or over-the-counter submissions.
In-person submissions or rejections from the permit office can extend timelines.
A rejected permit is sent back for rework, where a dedicated team identifies the issue.
External factors like holiday delays or customer issues can impact this process.
Once the permit is approved, the install is scheduled.
Generally, installs are scheduled no more than a week ahead to maintain flexibility.
Smaller installs can take 1 day, while larger projects may take 2-3 days.
Any prior issues like re-roofing or meter problems can delay scheduling.
Install scheduling needs to be efficient to avoid delays in future jobs.
Time Consideration: 1-5 days (depending on complexity)
80% of installs are completed in 1 day; larger installs may take 2-3 days.
Delays for complicated installations or issues may require a go-back (scheduled within a few days).
Completion time depends on the scope of work and the installer team’s efficiency.
Installers’ compensation is based on completing jobs efficiently and meeting quality standards.
If additional time is needed, rescheduling may occur to maintain workflow.
Time Consideration: 3-60 days depending on inspection availability and location.
Inspections are scheduled after installation completion and can range from 3 to 60 days.
Some fire inspections or special requirements (like battery installs) may extend this time.
Delays are often caused by jurisdictional availability or permit complications.
Quick scheduling and flexibility in scheduling help mitigate these issues.
If inspections are delayed, communication with the customer is maintained
In LA, fire inspections can take 30-45 days (due to battery systems).
Time Consideration: 14-28 days (varies) can extend to 30-45 days for projects with batteries).
After passing inspection, PTO (Permission to Operate) is submitted.
For projects with battery systems, PTO may take 30-45 days for engineering reviews.
Southern California Edison (SCE) is often faster with PTO approvals (2-4 weeks).
If everything is in order, the homeowner can receive PTO approval within 2-4 weeks after passing inspection.
The system is ready for activation once PTO is granted.
Engineering reviews or special requirements can lengthen the process.
Delays in inspection may also push back PTO submission.
The company is committed to submitting PTO as quickly as possible after inspection.
Fast-tracking methods are employed where possible
Final inspection and other approvals may take longer in high-demand areas.
Time Consideration: 0-1 days
Once PTO is approved, the system is live and functional, marking the completion of the solar installation.
Post-PTO activities include final customer walkthroughs.
Delays are minimal once PTO is approved.
Time Consideration: Delays can add months, depending on the jurisdiction.
Meter spot issues, often tied to the MPU (Meter Placement Unit), can lead to delays.
The MPU process may add months before PTO is granted.
MPU approval timelines vary, depending on the location and planner availability.
Jurisdictional issues may lead to significant delays (especially for slower planners).
The team works closely with the local utility to speed up the MPU approval process.