Construction and Painting

Our Construction and Painting Department

We design and make all of our own scenery and large props. The construction team meet at the SADS HQ usually on a Thursday morning between 9.00am – Midday but other times can be arranged. They are responsible for transferring the set drawings from paper to a realistic and believable set. We are well known for the quality of the sets we build.

Once everything has been transferred to the theatre, it is their job to construct the set ensuring a safe environment for all on stage to work within.

If you have any skills such as woodworking, carpentry or just a general interest in set design and building and would be interested in joining our happy band, then please email us on

sads.ltd@gmx.co.uk

Our painting team tend to meet on a Tuesday morning as well as other times when required. They are responsible for the painting of all of our flats and backdrops as well as any props that need to be done. Once the set is built at the theatre, they ensure everything lines up as painted and touch up as required. If you would like to get involved in this area then please email us on sads.ltd@gmx.co.uk