Post date: Jun 23, 2010 5:59:6 AM
We had a great building weekend: we finished one side (the straight left one, as you face the truck) and cut out the plywood top and made the 1x4 supports for the right side. Scot and Raven also made some progress on mounting the foundation brackets.
Next meetings will be Friday 3-evening, Saturday 11-evening, and Sunday 11-evening. I'd like to get a couple of things done in that time:
The side pieces: Finish the right side, figure out how the front piece attaches/detaches to the front piece, cut out and build the front piece
The foundation: finish drilling the holes for the brackets; mount the brackets; figure out how we're making the floor so we can start working on that by Monday the 21st.
David and I have also sourced a possible place for getting a sliding back glass (http://www.awcaw.com) so that we don't have to climb into the truck from the side window anymore. I've emailed them for details, so hopefully I can get that picked up and maybe even installed in the next few days.