Temporary Works Design - load bearing scaffolding to Support the former Corby Festival Hall now replaced by the Cube Building
Temporary Works Projects Undertaken Include:
Heavy Duty Scaffolding Support Structures; for example, load bearing structures to support existing buildings during remedial works.
Assisting with lifting major new structures into their final position for the petrochemical, exploration and transport industries including large airport structures.
Oil Rig Heavy Lift: - 1000 Tonne Oil Rig Modular Unit in Houston Texas
Heathrow Terminal 5 Control Tower Temporary Works 600 Tonne Heavy Lift
Foyle Bridge 900 Tonne Side Spans - lifting into position
Dragardos Y Construccionnes Almeria Spain - 2500 Tonne Oil Rig Modular Units for Marathon Oil - Destined for the North Sea
Cochrane Bridge Alabama 1000 Tonne Approach Span Heavy Lifts
35 Tonne Machine Lifts and placing them into the existing building through a temporary roof opening at Corby Northants.