Calibration runs at low intensity (September 2018):
Beam: mu+
Magnet: +830 A and -830 A, BxL=4.0245
5000 trigger/events per run
Energy points, maget, trigger:
- 18 +830 A, -830A, triple coincidence (4 runs)
- 20 +830 A, -830A, triple coincidence, S1 (6 runs)
- 22 +830 A, -830A, triple coincidence
- 24 +830 A, -830A, triple coincidence, S1
- 26 +830 A, -830A, triple coincidence
- 28 +830 A, -830A, triple coincidence
- 30 +830 A, -830A, triple coincidence, S1
- 32 +830 A, -830A, triple coincidence, S1
Calibration runs at low intensity (August 2018):
DT alignment:
mu+/pi+: 18 22 26 GeV B up
18 22 26 GeV B down
* for silicon detectors (after magnet) alignment:
positrons: 18 20 22 24 26 B up
18 20 22 24 26 B down
* gamma cal calibration
positrons 45 GeV B=0 T
40 GeV B=0 T
* overall test with target
positrons 45 GeV B nominal