REPRESENTATIVE PROJECTS: COASTAL AND PORT (PART 2)
Capital Dredging And Breakwater Construction Works At 2nd Inner Harbour, Bintulu, Sarawak
Description
Capital dredging, reclamation works and breakwater construction at Second Inner Harbour of Bintulu Port.
Independent Oil Terminal Project At Senari, Kuching, Sarawak (Package 2 - Engineering, Procurement, Construction And Commissioning Of Jetty)
Description
The Firm has been engaged as EPCC Consultant to provide professional engineering services in connection with the investigation, study, and design and construction supervision for the project.
1000 m General Cargo Wharf, Bintulu Port, Bintulu, Sarawak
Description
The proposed new cargo wharf was designed to accommodate cargo vessels up to 50,000 DWT with draught 12.4 metres.
It is equipped with 500m of crane rails provisions for the unloader cranes.
The main scope of the works is the construction and completion of 1000m long general cargo wharf and a ro-ro ramp at the eastern end of the wharf.
Palm Oil Terminal At 2nd Inner Harbour, Bintulu Port, Bintulu, Sarawak
Description
The palm oil terminal is designed to accommodate palm oil tankers up to 50,000 DWT and / or 220m LOA.
The design of this palm oil terminal is carried out by the Firm using in-house Malaysian Professionals.