January
- Bathroom Renovation
- Removed a window
- Roughed in plumbing
- Hung drywall
- Installed shower surround
- Removed & re-installed toilet
- Installed peel & stick flooring
- Wired ceiling fan
- TV installation
- hung 26" LCD TV in bedroom
- hung 55" LCD TV in living room
- run outlets behind both tv's & hide AV cables in wall
February
- Laundry Room Renovation
- Installed base, upper, & pantry cabinets
- Installed laminate counter top
- Installed sink, plumbing, & faucet
March
- Built custom built-in bookshelf
June
- Simple plumbing - installed 2 new faucets & drains after sinks & counter top were changed
July
- Laundry Room Renovation
- Drywall repair & texture
- Replaced 2 light fixtures
- Installed base board & door casing
- Installed faucet & drain for laundry sink
August & September
- Finished a basement
- Installed, mud & taped, & textured drywall
- Primed & painted
- Installed doors
- Installed baseboard & window & door casing
- Installed toilet & sink
- Installed light fixtures
- Textured a bedroom
- Basement Bedroom & Bathroom Renovation
- Framed exterior walls
- Installed insulation
- Installed, mud & taped, & textured drywall
October, November, & December
- Press Box for baseball field renovation
- Framed & sheathed 18' x 9.5' press box
- Installed 2 4' x 7.5' windows
- Installed exterior & interior door
- Installed cement siding
- Installed steel roof
- Installed 1/2" plywood on interior walls
- Installed window & door casing & baseboard