Weekly - Winter 2009
January 8 - Introduction to Microcontrollers
Course Introduction
Laboratory: Introduction to Basic Stamp Kits
Create web page notes that include sample programs
Assigned:
Complete the Basic Stamp Starters Book - make notes on web
Review the Parallax website
What kits and peripherals are available?
What processors are available?
Add links to some valuable resources and tools
e.g., Parallax Resources
Search the web
Nondisclosure agreement for EGR 604 DOC
Complete Skills Self Evaluation form
January 15 - Project Launch
Kendall projects and team formation
Laboratory: Introduction to Basic Stamp Kits (cont'd)
continue the work begun last week
Assigned:
Complete the basic stamp tutorial
Jack: Chapters 2-drafting, 3-metrollogy, 4-Cutting
Write notes about the chapters. Add figures as appropriate.
January 22 - Machining Qualification
Lecture:
Discussion of Projects
Safety and Machining
Laboratory: Introduction to Machine Shop
Introduction by Mr. Bob Bero
Implement a DC motor controller [Manual PDF]
Assigned:
A program and schematic on your notes page for the servo control system.
January 29 - Milling
Lecture:
Mill/lathe Qualification
Projects
Laboratory:
Prototyping Continues
Preparation for presentations
Assigned:
Prepare prototypes for presentation
February 5 - Prototype Assessment
Lecture:
Meeting with Kendall Students to assess design progress
A zip file with pictures of the class meeting
Laboratory:
Groups continue Mill qualification
Assigned:
Complete parts and drawings required for qualification
Read book - Joining
Read book - Rotation of mechanical systems
Read book - Feedback Control Systems
February 12 - Mechanical Components
Lecture:
Continued project work
Finalize first draft of layout of prototype
Laboratory:
Groups do Lathe qualifications
Groups do Welding Qualifications
Assigned:
Send Layout plan to project sponsors
Receive layout plans from sponsor and respond
Continue detailed design
Book: Jack - Ch. 8 Mechanical Power Transmission
Book : Jack - Ch. 9 Mechanical Design Issues
February 19 - CAD/CAM
Lecture:
Preparing CAD files with Pro/E
CNC Machining Qualification
Laboratory:
CAD/CNC tutorial
Assigned:
Prepare for presentation of digital files
Complete Keytag
February 26 -
Lecture:
Meet with Kendall Sponsors to merge digital files
Laboratory:
Assigned:
March 5 - March Break
March 12 -
Lecture:
Grad open house - cancelled
Laboratory:
Wrap up outstanding work
Project work, prepare for meshing of form and function designs.
Assigned:
Project work.
March 19 - Merge Designs (postponed)
Laboratory:
Break Welds
Finalize Functional Prototypes for test next week
Assigned:
Prepare final designs for comparison with sponsors
March 26 - Merge Designs
Laboratory:
Meet with Project Sponsors - get signoff on final prototype.
Assigned:
Prepare for presentation
April 2 - Documentation
Laboratory:
Prepare final documentation for handoff to sponsor
Assigned:
Coordinate with sponsor for the presentation
April 9 - Design Presentation Internal
Present designs to the class for critical review
April 16 - Project Handoff to Sponsor Deadline
April 28 or 29 - Project Presentations at Kendall