Project titled: Design and Investigation of Emergent Quantum Materials
Duration: 1 year (2026)
Budget: ~ JPY 43 Lakh
PI: Dr. Tathamay Basu
Japanese PI: Dr. Tsujimoto Yoshihro (NIMS Lab)
Fellowship candidate: PhD student Mr. Mohit Kumar
Seed Research Grant (SRG) fund from the Science and Engineering Research Board (SERB) (File Number: SRG/2022/000044).
Project titled "Design and Investigation of magnetoelectric materials- an emerging route in data-storage devices".
Duration: 2 years (2022-2024)
P.I. : Tathamay Basu
Budget: ~ INR 33 Lakh
Collaborative Research Scheme (CRS) Project fund from UGC-DAE CSR (Ref.: CRS/2021-22/03/544).
Project Title: 'Investigation of magnetic structure and magnetoelectric coupling of designed 4d/5d -4f coupled strongly correlated systems '.
Duration: 3 years (2022-2025)
P.I. : Tathamay Basu
Collaborator: Dr. S. D. Kaushik, UGC-DAE, Mumbai, BARC
Budget: ~ INR 1.5 Lakh
Project title: Development of High-performance GeSe-based thermoelectric materials for waste heat to electrical energy conversion
Duration: 3 Years (2025-2028)
Co- P.I.: Dr. Tathamay Basu , P.I. : Dr. Tanmoy Ghosh (RGIPT)
Budget: ~ INR 15 Lakh
Beamtime Awarded as P.I. in International Large-scale Facilities from RGIPT
Neutron beamtime at POWGEN in ORNL, USA, in 2026
Neutron (INS) beamtime at MELIN, ISIS, UK in 2026
muon beamtime at HIFI in ISIS, UK in 2026
Synchrotron HR-XRD beamtime at Photon Factory, KEK, Japan in 2025.
Neutron beamtime at SNAP (SNS) and VERITAS (HFIR) in ORNL, USA, in 2025
Muon beamtime at EMU and MUSR at ISIS, UK, in 2025.
INS beamtime at MARI, ISIS Facilities, STFC, UK in 2024.
Neutron time-of-flight beam-time at SNAP in ORNL, US, in 2024.
XAS beamtime at SAMBA in SOLEIL, France, in 2024.
Muon beamtime at ISIS Facilities, STFC, UK in 2024.
Neutron beam-time at WISH spectrometer, ISIS Facilities, STFC, UK in 2023.
X-ray (XAS and HR-XRD) beamtime at SOLEIL, France, in 2022.
Neutron beam-time under high pressure in ORNL, US, in 2022.