Seed Research Grant (SRG) fund from the Science and Engineering Research Board (SERB) (File Number: SRG/2022/000044).
Project titled "Design and Investigation of magnetoelectric materials- an emerging route in data-storage devices".
Duration: 2 years (2022-2024)
Collaborative Research Scheme (CRS) Project fund from UGC-DAE CSR (Ref.: CRS/2021-22/03/544).
Project Title: 'Investigation of magnetic structure and magnetoelectric coupling of designed 4d/5d -4f coupled strongly correlated systems '.
Duration: 3 years (2022-2025)
Beamtime Awarded in International Large-scale Facilities from RGIPT
Synchrotron HR-XRD beamtime at Photon Factory, KEK, Japan in 2025.
Neutron beamtime at SNAP (SNS) and VERITAS (HFIR) in ORNL, USA in 2025
Muon beamtime at EMU and MuSR at ISIS, UK in 2025.
INS beamtime at MARI, ISIS Facilities, STFC, UK in 2024.
Neutron time-of-flight beam-time at SNAP in ORNL, US in 2024.
XAS beamtime at SAMBA in SOLEIL, France in 2024.
Muon beamtime at ISIS Facilities, STFC, UK in 2024.
Neutron beam-time at WISH spectrometer, ISIS Facilities, STFC, UK in 2023.
X-ray (XAS and HR-XRD) beamtime at SOLEIL, France in 2022.
Neutron beam-time under high pressure in ORNL, US in 2022.