Previous Reviews

Previous Review Log - Recommendations and Responses

September 2017 Cost and Schedule Review

Cost And Schedule Review - Recomendations and Responses.pdf

Winter 2018 OPA Phase 1 Review

Updated 8/22/19
OPA Phase 1 - Recommendations and Responses - Updated 8:22:19.pdf

September 2018 Director's Review

Directors's Review #1- Recommendations and Responses.pdf

March 2019 Basis of Estimate Review (BoER)

BoER - Recommendations and Responses.pdf

July 2019 Director's Review

Directors Review #2 - Recommendations and Responses.pdf

Major Reviews and Recommendations for NSTX-U Program and Recovery Project

The primary purpose of this review was to receive feedback on the proposed cost and schedule in support of the FY-17 Extent of Condition Notable Outcome.

The committee report is located here, and the PPPL response to recommendations is located here.

The primary purpose of the NSTX-U Research Program Advisory Committee (PAC-39) meeting was to help the NSTX-U team prepare for the DOE/SC Assessment of NSTX-U Mission Need (see below). The PAC-39 Report is downloadable from here.

The purpose of the DOE/SC Assessment Phase 1 was to evaluate PPPL's proposed organization, capability, and means to execute the NSTX-U Facility recovery plans and resume operations.

The final report from the DOE/SC Assessment of NSTX-U Recovery Plans (Phases 1 and 2) is downloadable from here, and responses to Phase 1 recommendations are located here.

The purpose of the DOE/SC Assessment Phase 2 was to evaluate the continued Mission Need for the NSTX Upgrade facility and associated research program. Additional Science Mission documents are located here.

The final report from the DOE/SC Assessment of NSTX-U Recovery Plans (Phases 1 and 2) is downloadable from here.

The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in later 2018 or early 2019.

The final report from this Director's Review is available here.

The PPPL responses to the recommendations are available above or here.

The purpose of this review was to assess if the Basis of Estimate for the NSTX-U cost and schedule estimate was well documented, comprehensive, accurate and credible as defined by GAO-09-3SP and DOE Order 413.3B.

The final report from the Basis of Estimate Review is available here.

The PPPL responses to the recommendations are available above or here.

The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in the summer of 2019.

The final report from this Director's Review is available here.

The PPPL responses to the recommendations are available above or here.

Extent of Condition and Extent of Cause Reports

  • NSTX-U Extent of Condition Report (September 2017)
  • PPPL Extent of Cause Report (September 2017)