ES&H, Accelerator Safety Order, Commissioning, and Transition to Operations Documents
Health and Safety Plan
Posted 8/10/19Health and Safety Plan
NSTX-U Recovery Project_CDE-3A HASP_8.8.19_signed pdf.pdf
Hazard Analysis
Hazard Analysis
Hazard Analysis Report
Posted 8/10/19 Hazard Analysis Report
NSTX-U-DOC-123-03 HAR _JLM_ LH_SPG.pdf
Preliminary Hazard Analysis Report
Posted 8/10/19Preliminary Hazard Analysis Report
NSTX-U-DOC-112-00_PHAR_20180622.pdf
Memo on Hazard Analysis Methodology
Posted 7/22/19 Memo on Hazard Analysis Methodology
Memo_on_NSTX-U_SAD_Risk_Analysis.pdf
Project Plans - ASO, TTO, and Commissioning
Project Plans - ASO, TTO, and Commissioning
Accelerator Safety Order Implementation Plan
Posted 7/22/19Accelerator Safety Order Implementation Plan
NSTX-U-PLAN-004-01_ASO_Implementation_all_signatures.pdf
NSTX-U Training and Qualification Plan
Uploaded 7/22/19NSTX-U Training and Qualification Plan
NSTX-U-PLAN-015-00_TQ_MJD_TNS_MG_ST (2).pdf
Testing and Commissioning Plan
Posted 7/22/19 Testing and Commissioning Plan
NSTX-U-PLAN-014-00_Commissioning_SPG_REF.pdf - 2019-02-20-23_59.pdf
Transition to Operations Plan
Posted 7/22/19Transition to Operations Plan
NSTX-U-PLAN-032-00_TTO_SPG.pdf - 2019-02-28-0106.pdf
Procedure Update Plan
Posted 7/22/19Procedure Update Plan
NSTX-U-PLAN-018-00 (6).pdf - 2019-02-10-22_41.pdf
ARR Plan
Posted 8/11/19ARR Plan
NSTX-U-ARR-Plan (NSTX-U-PLAN-016-01) 8.9.2019_JM_SPG_ST_LH_SPG.pdf
Activity Certification Committee Plan
Posted 7/22/19 Activity Certification Committee Plan
NSTX-U-PLAN-005-00_ACC_Plan_SPG_JM (2).pdf
NEPA Determination
Posted 7/22/19NEPA Determination
NEPA 1631 - NSTX-U Recovery Project.pdf