ES&H, Accelerator Safety Order, Commissioning, and Transition to Operations Documents

Health and Safety Plan

Posted 8/10/19
NSTX-U Recovery Project_CDE-3A HASP_8.8.19_signed pdf.pdf

Hazard Analysis

Hazard Analysis Report

Posted 8/10/19
NSTX-U-DOC-123-03 HAR _JLM_ LH_SPG.pdf

Preliminary Hazard Analysis Report

Posted 8/10/19
NSTX-U-DOC-112-00_PHAR_20180622.pdf

Memo on Hazard Analysis Methodology

Posted 7/22/19
Memo_on_NSTX-U_SAD_Risk_Analysis.pdf

Project Plans - ASO, TTO, and Commissioning

Accelerator Safety Order Implementation Plan

Posted 7/22/19
NSTX-U-PLAN-004-01_ASO_Implementation_all_signatures.pdf

NSTX-U Training and Qualification Plan

Uploaded 7/22/19
NSTX-U-PLAN-015-00_TQ_MJD_TNS_MG_ST (2).pdf

Testing and Commissioning Plan

Posted 7/22/19
NSTX-U-PLAN-014-00_Commissioning_SPG_REF.pdf - 2019-02-20-23_59.pdf

Transition to Operations Plan

Posted 7/22/19
NSTX-U-PLAN-032-00_TTO_SPG.pdf - 2019-02-28-0106.pdf

Procedure Update Plan

Posted 7/22/19
NSTX-U-PLAN-018-00 (6).pdf - 2019-02-10-22_41.pdf

ARR Plan

Posted 8/11/19
NSTX-U-ARR-Plan (NSTX-U-PLAN-016-01) 8.9.2019_JM_SPG_ST_LH_SPG.pdf

Activity Certification Committee Plan

Posted 7/22/19
NSTX-U-PLAN-005-00_ACC_Plan_SPG_JM (2).pdf

PSO Concurrance with ASO Implementation Plan

Posted 8/27/19
ASO IP Concurrence.pdf

Correspondence on the ASO Implementation Plan

Posted 8/28/19

NEPA Determination

Posted 7/22/19
NEPA 1631 - NSTX-U Recovery Project.pdf