Project QA Plan
Posted 7/22/19Project Chit Tracking Plan
Posted 7/22/19Project FO Plan
Posted 7/22/19WBS 1.1.1 - PFCs
WBS 1.1.2-Vacuum Vessel and Internal Hardware
WBS 1.1.3 - Magnets
WBS 1.3.1 Bakeout
WBS 1.3.3 Vacuum and Fueling
No Recovery Project Design Reviews
WBS 1.09.02 NSTX-U Reassembly
WBS 1.09.04 NSTX-U Personell Protection System
WBS 1.10