Engineering and Design Docs

PPPL Engineering Procedures for Design, Procurement, Fabrication, Procedures, T-Mods (Links Below)

Posted 7/22/19

ENG-006: Preparation, Review, and Approval of Technical Specifications

ENG-010 - Control of Drawings

ENG-030 - PPPL Technical Procedures

ENG-032 - Work Planning Procedure

ENG-033 - Design Verification

ENG-036 - Control of Temporary Modifications

ENG-050 - Job Requirements Documentation & Control

ENG-059 - Process Plan/Traveler for PPPL Built Components

ENG-060 - Preparation, Review & Approval of SOWs

ENG-061 - Engineering Document and Record Numbering

ENG-062 - Planning and Performing Tests

ENG-063 - System Breakdown Structure and Categorization

ENG-064 - Interface Control

Lab-Wide QA and ES&H Procedures (Links Below)

Posted 7/22/19

QA-003 - Procurement Quality Assurance and Supplier Qualification

QA-004 - QA/QC Site Inspection and Oversight

QA-005 - Control of Nonconformances

QA-028 - Software Quality Assurance

ESH-004 - Job Hazard Analysis

ESH-016 - Control of Hazardous Energy (Lockout/Tagout)

ESH-025 - Operations Hazard Classification Criteria and Safety Certification System

Project Plans

Posted 7/22/19

Project QA Plan

Posted 7/22/19
NSTX-U-QAP-001-02 NSTX-U QA Plan.pdf

Project Chit Tracking Plan

Posted 7/22/19
NSTX-U-PLAN-003-01 CHIT Tracking Closure Plan.pdf

Project FO Plan

Posted 7/22/19
NSTX-U-PLAN-001-00 Fabrication Oversight_Plan_R1.pdf

NSTX-U Recovery Design Materials

Posted 7/24/19

Calculation Archive: link

Drawing Archive: link

SoW and Tech Spec Archive: link

Integration Reviews

Posted 7/22/19

TF Bundle Review #2 Report

Updated 7/24/19
2nd Review of NSTX-U TF Bundle Insulation - final v1.pdf

Design Reviews by Work Breakdown Structure (WBS)

Updated 7/24/19

WBS 1.1 TORUS SYSTEMS

WBS 1.1.1 - PFCs

WBS 1.1.2-Vacuum Vessel and Internal Hardware

WBS 1.1.3 - Magnets

WBS 1.3 AUXILIARY SYSTEMS

WBS 1.3.1 Bakeout

WBS 1.3.3 Vacuum and Fueling

WBS 1.4 PLASMA DIAGNOSTICS

WBS 1.5 POWER SYSTEMS

WBS 1.6 CENTRAL I&C

No Recovery Project Design Reviews

WBS 1.8 SITE PREPARATION / ASSEMBLY

WBS 1.9 Site Preparation and Assembly

WBS 1.09.02 NSTX-U Reassembly

WBS 1.09.04 NSTX-U Personell Protection System

WBS 1.10

Maintenance and Run Preparation Reviews