[9/21/21] Hawryluk Review: Report: Link
Scope: Determined design changes that may be needed were the fabrication of a new bundle required
[10/6/21] Todd Review: Report: Link, Review Page: Link
Scope: Make recommendations for remediation of the existing bundle, and assess if needed design changes for new bundle have been identified
[1/10/22] RFP Issued for Three Phase Bundle Fabrication Contract: SoW: Link
[4/6/22] ELYTT Energy contract award for Phase 1 design support. Corprate Site: link
[4/5/22] Contract for OH Cu extrustions awarded to Luvata. Corporate Site: link
[3/3/22] New Bundle PDR: Revew Page: Link, Design Review Chair Report: Link
Scope: Assess changes to the proposed design
Use Hawryluk and Todd committee reports as guidance
[5/11/22] Katramados/Ellis Review: Report: Link, Review Page: Link
Scope: Determined if any additional forensics needed to be done on the existing bundle to support new bundle design.
[6/6/22] Contract for TF extrustions awarded to Luvata. Corporate Site: link
[6/30/22] Contract for TF extrustions awarded to KME. Corporate Site: link
[7/6/22] New Bundle FDR: Report: Link, Review Page: Link
See review page for all presentations. Select links:
[7/6/22] Awarded contract for gun drilling of 12 test coupons, Corprate Site: Link
[8/1/22] ELYTT Energy contract award for Phase 2 design support. Corprate Site: link