September 2017 Cost and Schedule Review
September 2018 Director's Review (DR #1)
March 2019 Basis of Estimate Review (BoER)
July 2019 Director's Review (DR #2)
August 2019 CDE-2/3A IPR
March 2020 Project FDR
April 2020 Director's Review (DR#3)
May 2020 CDE-3B IPR
February 2021 Director's Review (DR#4)
Summer 2021 RCA
September 2021 Director's Review (DR#5)
March 2022 Bundle BOE Review
NSTX-U Cost and Schedule Review (September 6-8, 2017)
The primary purpose of this review was to receive feedback on the proposed cost and schedule in support of the FY-17 Extent of Condition Notable Outcome.
The committee report is located here, and the PPPL response to recommendations is located here.
NSTX-U Program Advisory Committee (PAC- 39) (January 9-10, 2018)
The primary purpose of the NSTX-U Research Program Advisory Committee (PAC-39) meeting was to help the NSTX-U team prepare for the DOE/SC Assessment of NSTX-U Mission Need (see below). The PAC-39 Report is downloadable from here.
DOE/SC Assessment of NSTX-U Recovery Plans - Phase 1 (February 6-8, 2018)
The purpose of the DOE/SC Assessment Phase 1 was to evaluate PPPL's proposed organization, capability, and means to execute the NSTX-U Facility recovery plans and resume operations.
DOE/SC Assessment of NSTX-U Recovery Plans - Phase 2 (March 14-16, 2018)
The purpose of the DOE/SC Assessment Phase 2 was to evaluate the continued Mission Need for the NSTX Upgrade facility and associated research program.
NSTX-U Director's Review #1 (September 5-7, 2018)
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in later 2018 or early 2019.
The final report from this Director's Review is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U Recovery Basis of Estimate Review (March 18-20, 2019)
The purpose of this review was to assess if the Basis of Estimate for the NSTX-U cost and schedule estimate was well documented, comprehensive, accurate and credible as defined by GAO-09-3SP and DOE Order 413.3B.
The final report from the Basis of Estimate Review is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U Director's Review #2 (July 16-18, 2019)
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in the summer of 2019.
The final report from this Director's Review is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U CDE-2/3A IPR (August 27-29, 2019)
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a ESAAB approval
The final report from this IPR is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U Project Final Design Review (March 17-19, 2020)
The purpose of this review was the verify the completion of final design for the NSTX-U Recovery Project
The final report from this review is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U Director's Review #3 (April 6-9, 2020)
The purpose of this review was to assess PPPL's readiness for the CDE-3B IPR.
The final report from this review is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U CDE-3B IPR (May 26-29, 2020)
The purpose of this review was to determine if the Recovery Project was ready for a CDE-3B ESAAB approval
The final report from this IPR is available here.
The PPPL responses to the recommendations are available above or here.
NSTX-U PAC 41 (May 13-14, 2020)
The purpose of this review was to receive feedback on the proposed NSTX-U five-year research plan, in advance of the DOE review.
NSTX-U Director's Review #4 (February 03, 2021)
The purpose of this review was to assess PPPL's readiness to rebaseline the Recovery Project
The final report from this review is available here.
The PPPL responses to the recommendations are available above or here.
Root Cause Analysis (September 28-30, 2021)
The purpose of this review was to assess the causes of the cost and schedule growth which resulted in the need to rebaseline.
The final report of this review is here.
PPPL responses to the recommendations are available above or here.
NSTX-U Director's Review #5 (September 28-30, 2021)
The purpose of this review was to assess PPPL's readiness to rebaseline the Recovery Project
The final report from this review is available here.
The PPPL responses to the recommendations are available above or here.
TF Bundle Basis of Estimate Review (March 15 & 17, 2022)
The purpose of this review was to evaluate the BOE for the TF/OH bundle.
The final report from this review is available here.
The PPPL responses to the recommendations are available above or here.