PHASING PLAN
CONSTRUCTION PHASES:-
Phasing plans in construction sites are outlined as follows:-
Preparation
Foundation
Structural
Exterior
Interior
Finishing
Finalization
PHASE 1:-
This process includes site evaluation, acquiring required licenses, clearing the land, and erecting makeshift buildings like material, plant, and storage spaces.
PHASE 2:-
Starting with the foundation, construction may involve excavating, pouring concrete, and establishing the structural base.
Building the structure of the building, including the walls, floors, and roof.
After the framework is in place, the building is sealed off from the weather with external walls, windows, and doors.
PHASE 3:-
The interior walls, ceilings, and flooring, as well as the mechanical, electrical, and plumbing installations, start.
Painting, fitting installation, and ornamental accents are applied as finishing touches.
To make sure everything complies with quality standards and laws, final inspections, testing, and system commissioning are carried out.