October 2021

Week of October 1, 2021

In the first picture below, you will see the new TPO roofing installation which has begun on the classroom wing.


In the second picture, you will see the brick veneer is being laid up to roof line of stair tower 1


The third and final picture shows the first load of sheet metal duct work is being delivered to the building.


The video below shows the front entrance and main office areas.


Week of October 8, 2021

In the first picture you will see the outside brick work as being completed by one of the building's stair towers.

In the second picture, you will see the exterior framing located on the second floor.

In the third picture, you will see the future cafeteria space for Arrowhead.


Below is a video of the 2nd floor

Week of October 15, 2021

In picture 1, you will see vapor barrier installation complete and ready for brick work to start on Gymnasium exterior walls.


In picture 2, you will see preparing under the slab stone base for slab and on grade pour next week in the new Administration wing.


In picture 3, you will see vapor barrier being installed on dense glass sheathing in preparation for brick veneer to follo

Week of October 22, 2021

In picture 1 you will see the control joints being cut along the freshly poured concrete slab on grade in the new administration office.


In picture 2 you will see new roofing installed on the flat roof and the sloped roof dried in.


In picture 3, you will see the topping out drywall on the framed interior walls.


See Video from October 22, 2021 below: