Roadway
Residential Development
Utility Work
Carpenter Farms
Southern Engineering - Lincolnton, NC
This project consisted of the site grading work for the proposed housing development above. Work being performed consisted of manly of observing overall site grading operations, performing density and compaction testing of backfill material, and performing proofrolling observations on final grade residential lots.
Inspector Observation and Documentation:
Earthwork: Excavation / Suitability / Trench Evaluation / Backfill / Final Grading / Restoration
Homewood / Brookside / Acorn – Waterline
City of Stow, OH
This project consisted of installation of a new C909 waterline along Homewood, Brookside, and Acorn roadways in the City of Stow, OH and included installation of fire hydrants. As a resident inspector I documented contractor workforce including number of employees, hours worked, equipment used, and delays if encountered. I also observed and documented excavation work, waterline material placement, fire hydrant connections and lateral installation, backfilling operations around pipes, final grading to allow for proper drainage, and grass seeding for work areas along Homewood Avenue.
Inspector Observation and Documentation:
Contractor: Workforce / Equipment / Material Deliveries
Earthwork: Excavation / Suitability / Trench Evaluation / Backfill / Final Grading / Restoration
Waterline: Material Approval / Installation Process / Quantities / As Built Location / Changes
Grant Road Extension and Parking Lot
Village of Richfield, OH
This project consisted of the expansion of Grant Road to Broadview Road, the addition of a parking lot, and the addition of a detention basin. As a resident inspector I observed and reported on the grading and placement of asphalt pavement materials (aggregate, tack coat, and asphalt), excavation, grading, and placement of permeable brick pavers for use in the roadway, concrete placement for curb, sidewalk, light pole foundations, and headwalls, the installation of conduit and wire for roadway and parking lot lighting.
Inspector Observation and Documentation:
Contractor: Workforce / Equipment / Material Deliveries / Change Orders / RFI’s / Delays / Discrepancies
Earthwork: Excavation / Suitability / Trench Evaluation / Backfill / Final Grading / Restoration
Asphalt Paving: Assess Standards and Requirements / Approve Sources / Verify Material and Mix Designs / Verify Equipment / Aggregate Base Compaction / Asphalt Temperature and Compaction / Measure Lift Thickness / Check Pavement Smoothness
Concrete: Assess Standards and Requirements / Approve Sources / Verify Material and Mix Designs / Verify Equipment / Inspect Formwork / Verify Dimensions / Schedule Testing Technician / Verify Test Results / Monitor Concrete Placement and Time
Permeable Pavers for Roadway: Assess Standards and Requirements / Approve Sources / Verify Material / Verify Equipment / Aggregate Base Compaction / Delivery of Pavers / Smoothness of Paver Surface
Electrical - Lighting: Material Approval / Foundation Excavation / Concrete Placement / Installation Process / Quantities / As Built Locations / Changes
Storm Sewer: Assess Standards and Requirements / Approve Sources / Verify Material Delivery / Verify Bedding Placement and Thickness / Observe Structure Placement / Observe Pipe Placement / Verify Elevation / Verify Slope / Mark As-Built Locations
Miner Drive – Storm Sewer
City of Brunswick, OH
This project consisted of the installation of approximately 3,200 lf of 12” to 42” pipe, 11 manholes, and 41 catch basins for the storm sewer drainage system for Miner Drive. As a resident inspector I observed and documented contractor workforce including number of employees, hours worked, equipment used, and delays if encountered. I also observed and documented construction operations in the form of the removal of pavement, drive aprons, and sidewalks, excavation of subgrade, elevation and slope verification, installation of catch basins, drainage structures, manholes, and pipes, backfilling, compaction, aggregate base, asphalt, and the connection to existing residential storm drainage. This work also included the relocation of various water, and sanitary lines that were found to impede the placement of the storm sewer. All information was documented and tracked by me and in many instances used for project billing and quantity tracking.
Inspector Observation and Documentation:
Contractor: Workforce / Equipment / Material Deliveries / Change Orders / RFI’s / Delays / Discrepancies
Earthwork: Excavation / Suitability / Trench Evaluation / Backfill / Final Grading / Restoration
Asphalt Paving: Assess Standards and Requirements / Approve Sources / Verify Material and Mix Designs / Verify Equipment / Aggregate Base Compaction / Asphalt Temperature and Compaction / Measure Lift Thickness / Check Pavement Smoothness
Concrete: Assess Standards and Requirements / Approve Sources / Verify Material and Mix Designs / Verify Equipment / Inspect Formwork / Verify Dimensions / Schedule Testing Technician / Verify Test Results / Monitor Concrete Placement and Time
Storm Sewer: Assess Standards and Requirements / Approve Sources / Verify Material Delivery / Verify Bedding Placement and Thickness / Observe Structure Placement / Observe Pipe Placement / Verify Elevation / Verify Slope / Mark As-Built Locations
CUY-91 - Resurfacing, Mayfield Heights, Ohio
Ohio Department of Transportation
This project consisted of updating and replacing existing sidewalk, curb, and gutters to meet new ADA requirements along Cuyahoga County Route 91 (SOM Center Road) through the cities of Mayfield Heights, OH and Gates Mills, OH. As the ODOT inspector observed and documented contractor workforce, hours worked, equipment used, plans and specifications followed. I also performed inspections on grading, formwork, placement of concrete, testing of concrete, and verification of the final product for approval per applicable ODOT and ADA specifications.
Inspector Observation and Documentation:
Contractor: Workforce / Equipment / Material Deliveries
Earthwork: Backfill / Final Grading / Restoration
Concrete: Assess Standards and Requirements / Approve Sources / Verify Material and Mix Designs / Verify Equipment / Inspect Formwork / Verify Dimensions / Monitor Concrete Placement and Time / Perform Concrete Testing