Search organization content
Embedded Files
IPL_Manual
  • Home
  • About Us
    • Our Founders
    • Our Team
  • Learning
    • SFS
    • Membrane & Tapes
    • Sheathing Board
    • Plasterboard
    • Insulation
    • Rendering & Plastering
    • Dry Lining
    • Screed
    • Soffit Insulation
  • Estimating
  • Projects
  • Contact us
  • Downloads
IPL_Manual
  • Home
  • About Us
    • Our Founders
    • Our Team
  • Learning
    • SFS
    • Membrane & Tapes
    • Sheathing Board
    • Plasterboard
    • Insulation
    • Rendering & Plastering
    • Dry Lining
    • Screed
    • Soffit Insulation
  • Estimating
  • Projects
  • Contact us
  • Downloads
  • More
    • Home
    • About Us
      • Our Founders
      • Our Team
    • Learning
      • SFS
      • Membrane & Tapes
      • Sheathing Board
      • Plasterboard
      • Insulation
      • Rendering & Plastering
      • Dry Lining
      • Screed
      • Soffit Insulation
    • Estimating
    • Projects
    • Contact us
    • Downloads

⮨Back

Drylining process are fastest way to construct partitions/ceilings and It's long-lasting material construction.



Where are used; Drylining construction are used in a commercial spaces/European residential projects/Independent Villas.



What can we construct; Party Wall/Internal Partition/Thermal/Sacrificial Lining/Ceilings/Metal Roofs

Gypframe Metal Studs

Deflection Head

Ply Noggins

Ceilings

Tape and Joint or Skim

Introduction of Partitions

Party Wall

Party wall are made between apartment/apartment and apartment/communal.

Specification;

Metal; Twin Vertical Studs and Base Track

Deflection;

Plasterboard Strips

Head Track (Deep Channel or Extra Deep Channel)

Gyproc Sealant

Acoustic; 3 Layer Insulation

Lining; 2 Layer plasterboard to each side of party wall

Fire Rating; 90/120/160/190 minute (*according to the design)

Internal Partition Type 1

Internal Partition Type 1 is without insulation wall are made within the apartment or communal corridor area.

Specification;

Metal; 70mm Vertical Studs

Deflection;

Plasterboard Strips

Head Track (Deep Channel or Extra Deep Channel)

Gyproc Sealant

Acoustic; Non-acoustic

Lining; Single Layer plasterboard to each side of partition

Fire Rating; 30/60/90 minute (*according to the design)

Internal Partition Type 2

Internal Partition Type 2 is with insulation wall are made within the apartment or communal corridor area.

Specification;

Metal; 70mm Vertical Studs

Deflection;

Plasterboard Strips

Head Track (Deep Channel or Extra Deep Channel)

Gyproc Sealant

Acoustic; Infill Insulation

Lining; Single Layer plasterboard to each side of partition

Fire Rating; 30/60/90 minute (*according to the design)

Thermal Lining/Sacrificial Lining

Thermal lining is made where there are staircase/lift/shaft-risers on the other side of the apartment. They provide sound & fire proofing to accommodation sides. 

Specification;

Metal; Vertical I Studs

Deflection; N/A

Acoustic; Infill Insulations

Lining; Single Layer plasterboard to one side of partition

Fire Rating; 60/90/120 minute (*according to the design)

Shaft/Riser Wall

Shaft/riser wall are located in the communal corridors. They highly fire rated wall to provide extreme level fireproofing.

Specification;

Metal; 70mm Vertical Studs

Deflection;

Plasterboard Strips (2 or 1 Layer)

Head Track (Deep Channel or Extra Deep Channel)

Gyproc Sealant

Acoustic; Infill Insulation

Lining; Single Layer plasterboard to each side of partition

Fire Rating; 60/90/120 minute (*according to the design)