The Clark and Enersen Concept plan includes new additions totaling 35,420 square-feet. The proposed additions would include a new Career and Technical Education facility directly to the south of the Ag classroom. A new classroom addition on the Northeast side of the building would include two (2) Pre-K classrooms, two (2) science classrooms, and nine (9) additional classrooms. Â
Key Features of the Proposed New Addition
New CTE Facility on 9th Street includes a metals shop, a woods shop, and two classroom areas
Two (2) Pre-K classrooms with outside entrance and access to 8th Street
Six (6) 1st-floor classrooms
Three (3) 2nd-floor classrooms
Two (2) science classrooms