2023 Foxcroft Ramp

EPICS Team Members 

Project Leader & Liaison:  Rocky C. '24

Project Archivist, Webmaster, & Investigative Tech:  Avery H. '23

Project Construction Manager & Finanical Officer: Stephanie R. '24

EPICS Team Leader:  Mrs. Julie Fisher, Director of STEAM Education

Project Goal:


Our main objective and motivation is to help faculty and students move wheeled carts and wagon in and out of Schoolhouse more easily. This will help protect everyone from unnecessary injuries from transporting heavy items. This project took one semester to build this first ramp custom designed for Schoolhouse. We hope that more ramps can be built to make other buildings across campus more accessible.

Design Photos:

(1)Front of the Ramp Design.

(2)Side of Ramp Design with Mold to the top stone step.

(3)Top down view of latches and handles of Ramps.

(4)Side of the ramp structure

(5)Side of the ramp handle design 

(6)Under the ramp structure 

(7)Ramp Handle 

(8)Storage Area

Instructional Video and Instructions

Video Tutorial:

Instructions:

Ramp don'ts

Movie.mov

Final Drawings of Ramp

These are our final design drawings and measurements that we used to build our ramps. It consists of the side, top, and bottom measurements of the ramps.

Notes and Measurements